Addendum #1 11 -06-2013 <br /> WATER, FORCE , AND RECLAIMED WATER MAINS . <br /> 1 . Show size and type of material used to construct mains . <br /> 2 . Show horizontal location and elevation of all tees , crosses , bends , terminal <br /> ends , valves , fire hydrants , air release valves , and sampling points , etc . , by <br /> distances from known reference points . <br /> 3 . Show location , size and type of material of all sleeves and casing pipes . <br /> 4 . Elevation and horizontal location of all storm sewers , gravity sewers including <br /> laterals , force mains , water mains , etc . which are crossed ; including <br /> clearance dimension at all conflicts or crossings . <br /> 5 . Top of pipe elevation and horizontal location of all water and force main stub- <br /> outs . <br /> 6 . Horizontal location of all services at the property lines . <br /> 7 . Horizontal and vertical location of pipe including size of all mains and ground <br /> elevation shall be obtained at one- hundred ( 100 ) foot intervals . Contractor <br /> shall place temporary PVC stand pipes (tell-tales ) at each of the one- <br /> hundred ( 100 ) foot intervals and at all fittings and conflicts/crossings to <br /> facilitate the record drawing survey. The tell -tale pipes shall be constructed <br /> of 2- inch PVC pipe , shall be placed on the top of the pipes to be surveyed , <br /> and shall be removed by the Contractor after completion of the field survey <br /> by the "As- Built" Professional Surveyor. <br /> 8 . Location of fire lines . <br /> 9 . Dedicated easement locations , identified by O . R . Book and Page Number. <br /> GRAVITY SEWER . <br /> 1 . Manholes : Elevation of top rim , bottom elevation and invert of each influent <br /> and effluent line . <br /> 2 . Show distance between manholes center-to-center and horizontal location by <br /> baseline station and offset . <br /> 3 . Show material size and type used to construct sewer mains . <br /> 4 . Show length ( center of manhole to end of stub ) distances from known <br /> reference points or baseline offsets , and elevation of stub-outs . <br /> 5 . Show which services have twenty ( 20 ) foot length of DIP at water main <br /> crossings . <br /> 6 . Show station and offset location of sanitary services' at property line . <br /> Particular care in dimensioning needed in special situations , i . e . , cul-de-sacs <br /> and locations where services are not perpendicular to wye . <br /> 7 . Show invert elevation of sanitary service at property line . <br /> 8 . Any and all necessary dedicated easement locations , identified by O . R . Book <br /> and Page Number. <br /> PUMP / LIFT STATION . <br /> Record Drawings shall show elevations for the top and bottom and diameter of wet <br /> well along with invert of effluent line . Record Drawings should also indicate the <br /> make , model number, horsepower, impeller and condition point of pumps selected <br /> and installed , shape of wet well , location of control panel , location of pump out <br /> connection , float level settings , any deviation from the plans , and serial numbers) of <br /> the pump(s) . <br /> 01025- 14 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Cncrifirntinnc rinr <br />