Laserfiche WebLink
Addendum # 1 11 -06-2013 <br /> times the square root of the distance in miles . <br /> ❑ (c) All surveys and maps or reports with elevation data shall indicate the <br /> datum and a description of the benchmark(s ) upon which the survey is based . <br /> 13 (d ) Minor elevation data may be obtained on an assumed datum provided the <br /> base elevation of the datum is obviously different than the established datum . <br /> (2) Horizontal Feature Accuracy : <br /> ❑ (a) Horizontal Control : All surveys and maps or reports expressing or <br /> displaying features in a publicly published coordinate system shall indicate <br /> the coordinate datum and a description of the control points upon which the <br /> survey is based . <br /> ❑ ( b) Minor coordinate data may be obtained and used on an assumed datum <br /> provided the numerical basis of the datum is obviously different than a <br /> publicly published datum . <br /> ❑ ( c) The accuracy of control survey data shall be verified by redundant <br /> measurements or traverse closures . All control measurements shall achieve <br /> the following closures : <br /> Commercial/High Risk Linear : 1 foot in 10 , 000 feet , <br /> Suburban : Linear: 1 foot in 7 , 500 feet , <br /> Rural : Linear: 1 foot in 5 , 000 feet , <br /> ❑ (d ) When statistical procedures are used to calculate survey accuracies , the <br /> maximum acceptable positional tolerance , based on the 95% confidence <br /> level , should meet the same equivalent relative distance standards as set <br /> forth in 61G17= 6 . 003(3 )( p)(2 . )( c) F .A. C . <br /> ❑ (e ) Intended Display Scale : All maps or reports of surveys produced and <br /> delivered with digital coordinate files must contain a statement to the effect <br /> of: " This map is intended to be displayed at a scale of 1 /_ or smaller" . <br /> 61 G17-6 . 004 Specific Survey, Map , and Report Requirements <br /> ( 1 ) As= Built/Record Survey : <br /> ❑ ( a ) Obtained field measurements of vertical or horizontal dimensions of <br /> constructed improvements so that the constructed facility can be delineated <br /> in such a way that the location of the construction may be compared with the <br /> construction plans . <br /> ❑ ( b) Clearly shows by symbols , notations , or delineations , those constructed <br /> improvements located by the survey. <br /> ❑ (c) All maps prepared shall meet applicable minimum technical standards . <br /> ❑ (d ) Vertical and horizontal accuracy of the measurements made shall be such <br /> that it may be determined whether the improvements were constructed <br /> consistent with planned locations . <br /> ( END OF SECTION ) <br /> 01025- 19 Technical Specifications <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Specifications.doc <br />