My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor, equipment , appliances , and materials required or necessary to clean up <br /> and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas affected <br /> thereby in a neat and orderly condition . Remove all rubbish , surplus materials , <br /> and unused construction equipment . Repair all damage so that the public and <br /> property owners will be inconvenienced as little as possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> drains , or catch - basins as a result of the CONTRACTOR' s operations , such <br /> material or debris shall be entirely removed and satisfactorily disposed of during <br /> the progress of the work , and the ditches , channels , drains , etc . , shall be kept <br /> clean and open at all times . <br /> D . Before the completion of the project , unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other construction <br /> equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and adjacent property affected <br /> by construction operations , in a neat and satisfactory condition . <br /> E . Restore or replace any public or private property damaged by construction work , <br /> equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . To this end , the <br /> CONTRACTOR shall restore all highway , roadside , and landscaping work within <br /> any right-of-way , platted or prescriptive . Acceptable materials , equipment , and <br /> methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment installed and on completion of the <br /> work , deliver the facilities undamaged and in fresh and new-appearing condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be placed on <br /> restoration of canals to equal or better condition than prior to construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only those <br /> cleaning materials which will not create hazards to health or property and which <br /> 01710 Site Cleanup <br /> 01710 - 1 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\01710 - <br /> Site Cleanup. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.