Laserfiche WebLink
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> Furnish all labor, equipment , appliances , and materials required or necessary to clean up <br /> and restore the site after the construction is completed . <br /> 1 . 2 REQUIREMENTS <br /> A . During the progress of the project , keep the work and the adjacent areas affected <br /> thereby in a neat and orderly condition . Remove all rubbish , surplus materials , <br /> and unused construction equipment . Repair all damage so that the public and <br /> property owners will be inconvenienced as little as possible . <br /> B . Provide onsite containers for the collection of waste materials , debris , and <br /> rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , gutters , <br /> drains , or catch - basins as a result of the CONTRACTOR' s operations , such <br /> material or debris shall be entirely removed and satisfactorily disposed of during <br /> the progress of the work , and the ditches , channels , drains , etc . , shall be kept <br /> clean and open at all times . <br /> D . Before the completion of the project , unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other construction <br /> equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and adjacent property affected <br /> by construction operations , in a neat and satisfactory condition . <br /> E . Restore or replace any public or private property damaged by construction work , <br /> equipment , or employees , to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations . To this end , the <br /> CONTRACTOR shall restore all highway , roadside , and landscaping work within <br /> any right-of-way , platted or prescriptive . Acceptable materials , equipment , and <br /> methods shall be used for such restoration . <br /> F . Thoroughly clean all materials and equipment installed and on completion of the <br /> work , deliver the facilities undamaged and in fresh and new-appearing condition . <br /> G . It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed , <br /> destroyed , or damaged during construction . Particular attention will be placed on <br /> restoration of canals to equal or better condition than prior to construction . <br /> H . When finished surfaces require cleaning with cleaning materials , use only those <br /> cleaning materials which will not create hazards to health or property and which <br /> 01710 Site Cleanup <br /> 01710 - 1 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\01710 - <br /> Site Cleanup. doc <br />