Change Order or when a Claim for an adjustment in Subcontractor is to be paid on the basis of
<br />Cost
<br /> Contract Price is determined on the basis of Cost of of the Work plus a fee , the Subcontractor'
<br />s
<br /> the Work , the costs to be reimbursed to Cost of the Work and fee shall be determined
<br /> CONTRACTOR will be only those additional or in the same manner as CONTRACTOR ' s Cost
<br /> incremental costs required because of the change in of the Work and fee as provided in this
<br /> para.
<br /> the Work or because of the event giving rise to the graph 11 . 01 .
<br /> Claim . Except as otherwise may be agreed to in
<br /> writing by OWNER , such costs shall be in amounts no 4 . Costs of special consultants
<br /> higher than those prevailing in the locality of the ( including but not limited to engineers ,
<br /> Project, shall include only the following items , and architects , testing laboratories , surveyors,
<br /> shall not include any of the costs itemized in para- attorneys , and accountants) employed for
<br /> graph 11 . 01 . 6 . services specifically related to the Work .
<br /> Payroll ooc +c for employees in +hc 5 . Supplemental costs including the
<br /> direGt employ of QC) INITRACTOR On the perfeF following :
<br /> a . The proportion of necessary trans-
<br /> portation , travel , and subsistence expenses of
<br /> w+th„nlit limitation supeFi;tendents , fo�T CONTRACTOR ' s employees incurred in dis-
<br /> charge of duties connected with the Work .
<br /> b . Cost, including transportation and
<br /> the basis Gf their tame spent on the IMAlork , maintenance, of all materials , supplies , equip-
<br /> Payroll raosts shall inGlude , but not be limited , ment, machinery, appliances , office , and
<br /> salaries and wages plus the Gest of fr a nge temporary facilities at the Site , and hand tools
<br /> not owned by the workers, which are consumed
<br /> OVntr obUtien61 unemploymeRt, en6ise , and in the performance of the Work, and cost, less
<br /> payroll taxes workers' Gempensa+�health market value , of such items used but not con -
<br /> and retirement benefits , IDGRuses, SiGk , sumed which remain the property of COW
<br /> TRACTOR .
<br /> The expense6 of nnrfnrminn Week ni l+cirlo of
<br /> C, Rentals of all construction equip-
<br /> legal shall be inGluded in the above to ment and machinery, and the parts thereof
<br /> +ho PmUcin+ al ltht4ri-,o,+ ►,, , nWNEP whether rented from CONTRACTOR or others
<br /> in accordance with rental agreements approved
<br /> 2 . Cost of all materials and equipment by OWNER with the advice of ENGINEER , and
<br /> furnished and incorporated in the Work , includ- the costs of transportation , loading , unloading ,
<br /> ing costs of transportation and storage thereof, assembly , dismantling , and removal thereof.
<br /> and Suppliers' field services required in All such costs shall be in accordance with the
<br /> connection therewith . All cash discounts shall terms of said rental agreements . The rental of
<br /> accrue to CONTRACTOR unless OWNER any such equipment, machinery , or parts shall
<br /> deposits funds with CONTRACTOR with which cease when the use thereof is no longer
<br /> to make payments , in which case the cash necessary for the Work.
<br /> discounts shall accrue to OWNER . All trade
<br /> discounts, rebates and refunds and returns d . Sales , consumer, use, and other
<br /> from sale of surplus materials and equipment similar taxes related to the Work , and for which
<br /> shall accrue to OWNER , and CONTRACTOR CONTRACTOR is liable , imposed by Laws and
<br /> shall make provisions so that they may be Regulations .
<br /> obtained .
<br /> e . Deposits lost for causes other than
<br /> 3 . Payments made by CONTRACTOR negligence of CONTRACTOR , any Sub-
<br /> to Subcontractors for Work performed by contractor, or anyone directly or indirectly
<br /> Subcontractors . If required by OWNER , CON - employed by any of them or for whose acts any
<br /> TRACTOR shall obtain competitive bids from of them may be liable , and royalty payments
<br /> subcontractors acceptable to OWNER and and fees for permits and licenses .
<br /> CONTRACTOR and shall deliver such bids to
<br /> OWNER , who will then determine , with the f. Losses and damages (and related
<br /> advice of ENGINEER , which bids, if any , will be expenses ) caused by damage to the Work , not
<br /> acceptable . If any subcontract provides that the compensated by insurance or otherwise , sus-
<br /> 00700 - General Conditions REV 5- 10- 13. doc
<br /> 00700 - 31
<br /> F . \Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00700 - General Conditions
<br /> REV 5- 10-
<br /> 13. doc
<br />
|