Laserfiche WebLink
The determination of the appropriate method ( s ) of compliance is the complete and sole <br /> responsibility of the BIDDER . Such methods will not be checked by the OWNER or <br /> ENGINEER for accuracy , completeness or any other purpose . The OWNER and <br /> ENGINEER shall have no responsibility to review or check the BIDDER ' s compliance <br /> with the Trench Safety Standards . <br /> 8 , The BIDDER , in submitting this bid , represents that it has obtained and considered all <br /> available geotechnical information , has utilized said geotechnical information and that , <br /> based on such information and the BIDDER ' s own information , the BIDDER has <br /> sufficient knowledge of the Project ' s surface and subsurface site conditions and <br /> characteristics to assure BIDDER ' s compliance with the applicable Trench Safety <br /> Standards in designing the trench safety system (s) for the Project . <br /> BIDDER : Cw� SAfi,L Lova, ! Ve �L) &acG, <br /> By : 1�-----? �'-- <br /> Position or Title : W � � � � v�n � , S �(n � �� . �reS , e( IJ <br /> Date : � CN , 2U , 2fl1 <br /> STATE OF f of � � d <br /> COUNTY OF lv\d ftaul R ucr <br /> Personally appeared before me , the undersigned authority , W iiatnrL P.,) , Scy) "S\ <br /> who after first being sworn by me , affixed his/her signature in the space provided above on this <br /> ?,04 I"day of 9, Wyv^,Wr , 20 I <br /> CikREHfl <br /> blic State of Florida <br /> Nota Pul State at large fission nry g ission EEo17547My Commission Expires <br />: 0!2112014 <br /> * * END OF SECTION * * . <br /> 00454 - Florida Trench Safety Act - REV 04-07. doc <br /> 00454 - 2 <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\ 1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00454 - Florida Trench Safety <br /> Act - REV 04-07 .doc <br />