Laserfiche WebLink
establish the standards by which such portion of the 47 . Unit Price Work—Work to be paid for <br /> on <br /> Work will be judged . the basis of unit prices. <br /> 39 . Shop Drawings—All drawings, diagrams, 48. Work—The entire completed construction <br /> illustrations , schedules, and other data or information or the various separately identifiable parts thereof re- <br /> which are specifically prepared or assembled by or for quired to be provided under the Contract Documents. <br /> CONTRACTOR and submitted by CONTRACTOR to Work includes and is the result of performing or <br /> illustrate some portion of the Work, providing all labor, services , and documentation <br /> necessary to produce such construction , and <br /> 40. Site—Lands or areas indicated in the furnishing , installing , and incorporating all materials <br /> Contract Documents as being furnished by OWNER and equipment into such construction , all as required <br /> upon which the Work is to be performed , including by the Contract Documents , <br /> rights-of-way and easements for access thereto , and <br /> such other lands furnished by OWNER which are 49 . Work Change Directive—A written <br /> designated for the use of CONTRACTOR . statement to CONTRACTOR issued on or after the <br /> Effective Date of the Agreement and signed by <br /> 41 . Specifications—That part of the Contract OWNER and recommended by ENGINEER ordering <br /> Documents consisting of written technical descriptions an addition , deletion , or revision in the Work, or <br /> of materials, equipment, systems, standards, and responding to differing or unforeseen subsurface or <br /> workmanship as applied to the Work and certain physical conditions under which the Work is to be <br /> administrative details applicable thereto. performed or to emergencies. A Work Change <br /> Directive will not change the Contract Price or the <br /> 42 . Subcontractor—An individual or entity Contract Times but is evidence that the parties expect <br /> having a direct contract with CONTRACTOR or with that the change ordered or documented by a Work <br /> any other Subcontractor for the performance of a part Change Directive will be incorporated in a subse- <br /> of the Work at the Site. quently issued Change Order following negotiations by <br /> the parties as to its effect, if any, on the Contract Price <br /> 43 , Substangal Completion The time a or Contract Times, <br /> 50 , Written Amendment—A written statement <br /> modifying the Contract Documents, signed by <br /> OWNER and CONTRACTOR on or after the Effective <br /> DOGUFFIeRtS, so that the Work (or a speGified part Date of the Agreement and normally dealing with the <br /> nonengineering or nontechnical rather than strictly <br /> " " and construction-related aspects of the Contract Docu- <br /> -sub6tantially Gempleted" as applied to all OF part of the ments. <br /> 1 . 02 Terminology <br /> 44 . Supplementary Conditions—That part of <br /> the Contract Documents which amends or A. Intent of Certain Terms orAdjectives <br /> supplements these General Conditions , <br /> 1 . Whenever in the Contract Documents the <br /> 45 . Supplier—A manufacturer, fabricator, terms "as allowed , " "as approved , " or terms of like <br /> supplier, distributor, materialman , or vendor having a effect or import are used , or the adjectives <br /> direct contract with CONTRACTOR or with any " reasonable, " "suitable, " "acceptable, " " proper, " <br /> Subcontractor to furnish materials or equipment to be "satisfactory, " or adjectives of like effect or import <br /> incorporated in the Work by CONTRACTOR or any are used to describe an action or determination of <br /> Subcontractor. ENGINEER as to the Work, it is intended that such <br /> action or determination will be solely to evaluate, in <br /> 46 . Underground Facilities—All underground general , the completed Work for compliance with <br /> pipelines, conduits , ducts, cables, wires, manholes, the requirements of and information in the Contract <br /> vaults , tanks, tunnels, or other such facilities or Documents and conformance with the design <br /> attachments, and any encasements containing such concept of the completed Project as a functioning <br /> facilities, including those that convey electricity, gases, whole as shown or indicated in the Contract <br /> steam , liquid petroleum products, telephone or other Documents (unless there is a specific statement <br /> communications, cable television , water, wastewater, indicating otherwise) . The use of any such term or <br /> storm water, other liquids or chemicals, or traffic or adjective shall not be effective to assign to <br /> ENGk <br /> other control systems. NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or <br /> 00700 - General Conditions REV 5-10-13 <br /> 00700 - 7 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTSM36-Gifford Senior BallfieldWdmin\bid documentsXMasterContract\Contract Documents100700 - General Conditions REV 5-10- <br /> 13.doc <br />