My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents unless CONTRACTOR knew or ate will be held to review for acceptability to ENGI - <br /> reasonably should have known thereof. NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> Be Preliminary Schedules: Within ten days after shall have an additional ten days to make corrections <br /> the Effective Date of the Agreement ( unless otherwise and adjustments and to complete and resubmit the <br /> specified in the General Requirements) , CONTRAC- schedules . No progress payment shall be made to <br /> TOR shall submit to ENGINEER for its timely review: CONTRACTOR until acceptable schedules are <br /> submitted to ENGINEER . <br /> 1 . a preliminary progress schedule <br /> indicating the times ( numbers of days or dates) 1 . The progress schedule will be <br /> for starting and completing the various stages acceptable to ENGINEER if it provides an <br /> of the Work , including any Milestones specified orderly progression of the Work to completion <br /> in the Contract Documents ; within any specified Milestones and the <br /> Contract Times . Such acceptance will not <br /> 2 . a preliminary schedule of Shop impose on ENGINEER responsibility for the <br /> Drawing and Sample submittals which will list progress schedule , for sequencing , scheduling , <br /> each required submittal and the times for sub- or progress of the Work nor interfere with <br /> or <br /> mitting , reviewing , and processing such relieve CONTRACTOR from CONTRACTOR ' s <br /> submittal ; and full responsibility therefor. <br /> 3 , a preliminary schedule of values for 2 . CONTRACTOR's schedule of Shop <br /> all of the Work which includes quantities and Drawing and Sample submittals will be <br /> prices of items which when added together acceptable to ENGINEER if it provides a <br /> equal the Contract Price and subdivides the workable arrangement for reviewing and <br /> Work into component parts in sufficient detail to processing the required submittals , <br /> serve as the basis for progress payments <br /> during performance of the Work. Such prices 3 . CONTRACTOR ' s schedule of values <br /> will include an appropriate amount of overhead will be acceptable to ENGINEER as to form <br /> and profit applicable to each item of Work . and substance if it provides a reasonable <br /> allocation of the Contract Price to component <br /> parts of the Work. <br /> the Site is started , CONTRACTOR and OWNE all <br /> each deliver to the other, with cop" <br /> o each ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> additional insured identified in t upplementary AMENDING , REUSE <br /> Conditions, certificates of urance (and other <br /> evidence of insuranc ich either of them or any <br /> additional insur may reasonably request) which 3 . 01 Intent <br /> CONTRA and OWNER respectively are <br /> A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> called for by all . <br /> 2 . 06 Preconstruction Conference <br /> Be It is the intent of the Contract Documents to <br /> � weeeewdescribe a functionally complete Project (or part there- <br /> to run , but before any Work at the Site i rted , a of) to be constructed in accordance with <br /> the Contract <br /> conference attended by CONTRACT ENGINEER , Documents . Any labor, documentation , services , <br /> and others as appropriate wil held to establish a materials , or equipment that may reasonably be <br /> Dee Ann thp narties as te the inferred from the Contract Documents or from <br /> Work and to disc a schedules referred to in para- prevailing custom or trade usage as being required to <br /> graph 2 . 05 . rocedures for handling Shop Drawings produce the intended result will be provided whether <br /> and er submittals , processing Applications for or not specifically called for at no additional cost to <br /> . OWNER . <br /> 2 . 07 Initial Acceptance of Schedules C . Clarifications and interpretations of the <br /> Contract Documents shall be issued by ENGINEER <br /> A. Unless otherwise provided in the Contract as provided in Article 9 . <br /> Documents , at least ten days before submission of the <br /> first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri- <br /> 00700 - General Conditions REV 5-10-13. doc <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\MasterContract\Contract Documents\00700 - General Conditions REV <br /> 5-10- <br /> 13. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.