My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 336A <br /> Asphalt Rubber Binder <br /> Binder Type ARB 5 ARB 12 ARB 20 <br /> Rubber Type TYPE A (or B)( ' ) TYPE(or <br /> TYPE C (z) <br /> (or A) (or B or A) <br /> Viscosity Range(4) 4 . 0 - 6 . 0 Poises 10 . 0 - 15 . 0 Poises 15 . 0 - 20 . 0 Poises <br /> @ 300OF @ 300OF @ 350OF <br /> 1 ) Use of Type B rubber may require an increase in the mix temperature in order to offset higher viscosity values . <br /> 2) Use of finer rubber could result in the reduction of the minimum reaction time. <br /> 3 ) Conversions to standard 60°F are as specified in 300-9 .3 . <br /> 4) FM 5 -548 , Viscosity of Asphalt Rubber by Rotational (Dip-N-Read) Viscometer or AASHTO T 316, Viscosity <br /> Determination of Asphalt Binder Using Rotational Viscometer, <br /> OTE : The Contractor may adjust the minimum reaction time if approved by the Engineer depending upon the temperature, size <br /> f the ground tire rubber and viscosity measurement determined from the asphalt rubber binder material prior to or during <br /> production. Apply the asphalt rubber binder for use in membrane interlayers within a period of six hours, unless some form of <br /> orrective action such as cooling and reheating is approved by the Engineer, <br /> 3364 Equipment. <br /> Use blending equipment that is designed for asphalt rubber binder and capable of <br /> producing a homogeneous mixture of ground tire rubber and asphalt binder meeting the <br /> requirements of Table 336- 1 . Use a batch type or continuous type blending unit that provides for <br /> sampling of the blended and reacted asphalt rubber binder material during normal production and <br /> provides for accurate proportioning of the asphalt binder and ground tire rubber either by weight <br /> or volume . <br /> In order to meet specification requirements , keep the asphalt rubber uniformly blended <br /> while in storage . Equip storage tanks with a sampling device . <br /> 336-5 Testing of Asphalt Rubber Binder : <br /> 336-5 . 1 Quality Control Requirements : Test the asphalt rubber binder for the viscosity <br /> ,y <br /> requirement of Table 336- 1 at the following frequencies and situations : <br /> 1 . One per batch (for batch blending) or two per day (for continuous blending) <br /> during blending at the project site or asphalt plant, or the supplier' s terminal . <br /> 2 . Each load delivered to the project site/asphalt plant when blended at the <br /> supplier ' s terminal . <br /> 3 . Beginning of each day from the storage tank when storing the asphalt rubber <br /> binder at the project site or asphalt plant, or the supplier ' s terminal , obtain the sample for testing <br /> from the discharge piping exiting the storage tank. <br /> Obtain the viscosity testing equipment specified in FM 5 - 548 and make it <br /> available to the Engineer for verification purposes at the project site/asphalt plant and supplier ' s <br /> terminal . <br /> 336-5 . 1 . 1 Action at Project Site or Asphalt Plant : If the asphalt rubber binder <br /> does not meet the minimum viscosity requirement at the project site or asphalt plant, stop use of <br /> the asphalt rubber binder in the Asphalt Concrete Friction Course and Asphalt Rubber <br /> Membrane Interlayer, notify the Engineer, and make the appropriate adjustments as necessary to <br /> meet the requirements of Table 336- 1 in order to : ( 1 ) correct the viscosity of the blended material <br /> and (2) correct the blending operation . In the event that the corrective actions taken fail to correct <br /> the problem, or the material consistently fails to meet the minimum viscosity requirement, do not <br /> - 99 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.