My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 5 ) Verify the water to cementitious materials ratio and other <br /> delivery ticket data meet design mix requirements . <br /> (6) Mix the concrete intermittently for 30 seconds every 5 minutes , <br /> at a speed greater than or equal to the midrange of the manufacturer' s recommended mixing <br /> speed. When concrete is not being mixed, agitate the mixer at the midrange of the manufacturer' s <br /> recommended agitating speed. <br /> ( 7) Determine slump, ambient and concrete temperatures at 30 <br /> minute intervals until the slump is 5 inches or less . Remix the mix for one minute at the mixing <br /> speed of the mixer before these tests are run . <br /> ( 8 ) Ensure that the concrete maintains a slump of at least 5 inches <br /> for the anticipated elapsed time . <br /> (9) Cast cylinders to determine when 500 psi compressive strength <br /> is obtained for the purpose of transporting field samples to the laboratory . <br /> ( 10) Obtain the Engineer ' s approval of slump loss test results in <br /> terms of elapsed time before concrete placements . <br /> SUBARTICLE 3464 . 2 . 2 (Page 326) is deleted and the following substituted : <br /> 346-4 .2 . 2 Certification : If any chloride test data exceeds the limits in Table 4 , <br /> identify the exception on the Construction Compliance with Specifications and Plans form . <br /> SUBARTICLE 346- 6 . 1 (Page 328 ) is deleted and the following substituted : <br /> 346-6 . 1 General : Develop a Quality Control Plan (QCP) as specified in Section 105 . <br /> Meet the requirements of the approved QCP and Contract Documents . Ensure the QCP includes <br /> the necessary requirements to control the quality of the concrete . <br /> Perform QC activities to ensure materials , methods , techniques , personnel , <br /> procedures and processes utilized during production meet the specified requirements . For <br /> precast/prestressed operations , ensure that the QC testing is performed by the producer. <br /> Accept the responsibility for QC inspections on all phases of work. Ensure all <br /> materials and workmanship incorporated into the project meet the requirements of the Contract <br /> Documents . <br /> When concrete plastic properties (slump , air content and temperature) could be <br /> significantly affected by handling between the point of delivery and the point of final placement, <br /> including the use of pumps , conveyor belts , troughs , chutes , barge transport or other means , <br /> include provisions in the QCP to sample the plastic concrete for all testing at the point of final <br /> placement. <br /> Ensure the QCP includes any anticipated requirements for adjusting the concrete <br /> at the placement site . Include the testing procedures that will be implemented to control the <br /> quality of the concrete and ensure that concrete placed is within the tolerance range . Also , <br /> include provisions for the addition of water to concrete delivered to the placement site at <br /> designated level areas , to ensure the allowable amount of water stated on the concrete delivery <br /> ticket or the maximum water to cementitious materials ratio on the approved design mix are not <br /> exceeded. Ensure the anticipated ranges of jobsite water additions are described and the proposed <br /> methods of measuring water for concrete adjustments are included. <br /> - 119 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br /> �i <br />
The URL can be used to link to this page
Your browser does not support the video tag.