SUBARTICLE 346 - 7 . 4 (Page 330) is deleted and the following substituted : <br /> 346-7. 4 Concreting in Cold Weather : Do not mix concrete when the air temperature is <br /> below 45 °F and falling. Mix and place concrete when the air temperature in the shade , and away <br /> from artificial heat, is 40°F and rising. Protect the fresh concrete from freezing until the concrete <br /> reaches a minimum compressive strength of 1 , 500 psi unless the concrete is to be heat cured. The <br /> requirements of concreting in cold weather are not applicable to precast concrete placement <br /> operations occurring in a temperature controlled environment . <br /> SUBARTICLE 346-7 . 6 (Page 33 1 ) is deleted and the following substituted: <br /> 346-7. 6 Transit Time : Ensure compliance with the following maximum allowable time <br /> between the initial introduction of water into the mix and depositing the concrete in place : <br /> TABLE 6 <br /> Non-Agitator Trucks Agitator Trucks <br /> 45 minutes 60 minutes <br /> 75 minutes * 90 minutes * <br /> *When a water-reducing and retarding admixture (Type D, Type G or Type II) is used. <br /> SUBARTICLE 346-7 . 7 (Page 331 ) is deleted and the following substituted : <br /> 346-7. 7 Adding Water to Concrete at the Placement Site : Perform an initial slump test <br /> before the addition of water at the jobsite . If the slump , as delivered, is outside the tolerance <br /> range , reject the load. If the slump is within the tolerance range, that load may be adjusted by <br /> adding water provided the addition of water does not exceed the water to cementitious materials <br /> ratio as defined by the mix design . After adjusting the slump, perform a slump test to confirm the <br /> concrete is within the slump tolerance range . Perform a slump test on the next load to ensure the <br /> concrete is within the slump tolerance range . Do not place concrete represented by slump test <br /> results outside of the tolerance range . <br /> ARTICLE 346 - 8 (Page 331 ) is deleted and the following substituted : <br /> 346-8 Plastic Concrete Sampling and Testing. <br /> QC tests include air content, temperature , slump , and preparing compressive strength <br /> cylinders for testing at later dates . In addition , calculate the water to cementitious materials ratio <br /> in accordance with FM 5 - 501 for compliance to the approved mix design . <br /> Ensure that each truck has a valid mixer identification card issued by the Department, the <br /> revolution counter on the mixer is working properly, and calibration of the water dispenser has <br /> been performed within the last twelve months and verify batch weights within required limits of <br /> the mix design . Reject any concrete batches that are delivered in trucks that do not have mixer <br /> identification cards . The Contractor may remove the mixer identification cards when a truck <br /> mixer is discovered to be in noncompliance . When the mixer identification card is removed for <br /> - 121 - <br /> FPID ( S ) : 423186 - 1 - 58 -01 <br />