Laserfiche WebLink
AIC I <br /> SUBARTICLE 350 - 9 . 1 (Pages 348 and 349) is deleted and the following substituted : <br /> 350-9 . 1 General Requirements : Immediately after placing the concrete , strike -off, <br /> consolidate , and finish it to produce a finished pavement in accordance with the cross - section, <br /> width, and surface finish required by the Contract Documents . Perform the sequence of <br /> operations as follows : strike-off; vibratory consolidation ; screeding; floating ; removal of <br /> laitance ; straightedging ; and final surface finish . Except as specified, perform strike-off, <br /> consolidation, screeding, and floating by the machine method . <br /> Use equipment that is fully and accurately adjustable to produce a pavement <br /> meeting project requirements . Use equipment that is capable of operating in a consistent and <br /> smooth manner under all conditions of use . <br /> As soon asP ossible after screeding while the concrete is plastic, correct all flaws <br /> such as cavities , blemishes , marks , or scratches that will not be removed by planing . . <br /> Provide a concrete surface true to grade , cross slope and superelevation, and free <br /> dding water to assist the finishing operations , apply <br /> of irregularities . If the Engineer permits a <br /> water as a fog spray by means of approved spray equipment. <br /> SUBARTICLE 350- 18 (Pages 357 - 358) is deleted and the following substituted: <br /> 35048 Basis of Payment. <br /> Prices and payments will be full compensation for all work specified in this Section, <br /> including any preparation of the subgrade not included in the work to be paid for under another <br /> Contract item; all transverse and longitudinal joint construction, including tie -bars and dowel <br /> bars ; the furnishing of test specimens ; repair of core holes ; and all incidentals necessary to <br /> complete the work. <br /> Payment will be made under: <br /> Item No . 350- 1 - Plain Cement Concrete Pavement - per square yard. <br /> Item No . 350- 2 - Reinforced Cement Concrete Pavement - per square yard . <br /> Item No . 350- 72 - Cleaning and Resealing Joints - per foot. <br /> Item No . 350- 78 - Cleaning and Sealing Random Cracks - per foot. <br /> 355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT . <br /> REV (24240) (FA 24740) (740 ) <br /> SECTION 355 - 1 (Page 368) is deleted and the following substituted : <br /> 3554 Description . <br /> Construct Value Added Portland Cement Concrete Pavement (Concrete Pavement) , <br /> subject to a five year warranty period after final acceptance of the Contract in accordance with 5 - <br /> 11 . This Section applies only to new pavements , including added lanes . <br /> Furnish a copy of each mix design to the Engineer at least 14 days prior to any paving <br /> work. <br /> Perform all the associated work specified in this Section including continued <br /> responsibility for performing all remedial work associated with pavement distresses exceeding <br /> - 129 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />