My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I IF <br /> "In nor, +� IF VF <br /> % on <br /> V 7V IF <br /> I I Von 11 Von <br /> rf _ 1 <br /> rh� VIVI �' „�. , �, , .� A. �$, ; aa � tsi :,,, " b ; - ' rrIF nk ..�.,�' , V4 e <br /> y� s `.$ t ' - it+ 47 <br /> ll IF I I <br /> eeeee <br /> SUBARTICLE 400452 . 5 . 5 (pages 398 — 399) is deleted and the following substituted : <br /> 40045 .2 . 5 .5 Smoothness Evaluation and Concrete Surface Planing, <br /> Long Bridges (including approach slabs) : Prior to planing, provide a smoothness evaluation of <br /> the completed bridge deck and exposed concrete surfaces of approach slabs by a computerized <br /> Cox California-type profilograph in accordance with the criteria herein and FM 5 - 558E . Furnish <br /> this evaluation through an independent provider approved by the Engineer, using equipment <br /> calibrated by the Engineer. All bridge deck and concrete approach slab surfaces to within 2 feet <br /> of gutter lines are subject to this smoothness evaluation . <br /> Prior to initial profilograph testing, complete work on the bridge <br /> deck and approach slabs . Thoroughly clean and clear the bridge deck and approach slab areas to <br /> be evaluated for smoothness of all obstructions and provide the smoothness evaluation . Ensure <br /> that no radio transmissions or other activities that might disrupt the automated profilograph <br /> equipment are allowed during the evaluation . <br /> Average the Profile Index Value for the bridge deck, including the <br /> exposed concrete surfaces of the approach slabs , for the left and right wheel path of each lane . <br /> The maximum allowable Profile Index Value for acceptable smoothness is 10 inches per mile <br /> utilizing the 0 . 2 inch blanking band . Apply these criteria to a minimum of 100 feet of each lane . <br /> Additionally, correct individual bumps or depressions exceeding a cutoff height of 0 . 3 inch from <br /> a chord of 25 feet (see ASTM E- 1274) on the profilograph trace . Ensure that the surface meets a <br /> 1 /4 inch in 10 feet straightedge check made transversely across the deck and approach slabs if <br /> determined necessary by the Engineer. Provide additional profilograph testing as necessary on <br /> In following longitudinal planing and any other actions taken to improve smoothness , until a profile <br /> meeting the acceptance criteria is obtained. <br /> Regardless of whether expansion joints are installed before or after <br /> deck planing is complete, plane off the concrete deck surface to a minimum depth of 1 /4 inch <br /> and also meet or exceed the profilograph smoothness criteria. Longitudinally plane the entire <br /> bridge deck and exposed concrete surfaces of the approach slabs using a self-propelled planing <br /> machine with gang mounted diamond saw cutting blades specifically designed for such work . <br /> Use the profilograph generated smoothness data, to establish the optimum planing machine <br /> settings . Plane the deck surface to within 2 feet of the gutter line so that there is a smooth <br /> transition, without vertical faces or sudden surface discontinuities , from the fully planed surface <br /> to the unplaned surface . Use a machine with a minimum wheel base length of 15 feet, <br /> constructed and operated in such manner that it does not cause strain or damage to deck or <br /> approach slab surfaces , excessive ravels , aggregate fractures or spalling. The equipment shall be <br /> approved by the Engineer. Perform longitudinal planing parallel to the roadway centerline, and <br /> provide a consistent, textured surface . Clean the surface of all slurry/debris generated during this <br /> work concurrently with operation of the machine . <br /> After the deck has been planed the minimum 1 /4 inch , reevaluate <br /> the surface smoothness using the profilograph testing described above . Perform cycles of planing <br /> and profilograph retesting as necessary until the deck and exposed concrete surfaces of approach <br /> slabs are in compliance with the smoothness criteria but do not exceed the maximum concrete <br /> removal depth of 1 /2 inch . <br /> 438 - <br /> FPID ( S ) : 423186 - I - 58 -01 <br /> VF <br /> ;LL FIFFOO <br /> IF - 7FFFFF Fl I IF FV IF <br /> ol <br /> #ln , n , 11 I�FV IF <br /> IF V <br /> In <br /> IF .. , . _ a � .. . .� . . . . , , .- I , �, 'SIV x v <br /> . no <br />
The URL can be used to link to this page
Your browser does not support the video tag.