E . . <br /> backfilling and tamping, but will not include payment for items paid for elsewhere in the <br /> a <br /> specifications . <br /> Payment shall be made under: ` <br /> Item No . 443 - 70 - French Drains - per foot. <br /> i <br /> 446 EDGEDRAIN (DRAINCRETE) — CONTROL OF QUALITY. <br /> c <br /> (REV 14540) (24940) (740) <br /> ARTICLE 446 -3 (Pages 438 — 439) is deleted and the following substituted : <br /> 446-3 Control of Quality. <br /> 446-3 . 1 Concrete Design Mix : Submit the proposed design mix prior to production, on <br /> the "Concrete Mix Design" form, for the Engineer' s approval . Use only draincrete design mixes <br /> having prior approval of the Engineer. Do not change the design mix component materials <br /> except as per 446 - 3 . 2 . <br /> The Department will verify the proposed mix design and may witness the trial <br /> batching. Meet the unit weight requirements as determined in accordance with FM 5 - 530 , and <br /> the drain rate in accordance with FM 5 - 570 . Also , provide one of the following with the design <br /> mix submittal : <br /> ( 1 ) Evidence from three sets of production data, either from Department <br /> acceptance tests or independently verifiable commercial mixes , that draincrete produced in <br /> accordance with the proposed design mix meets the requirements of this Section . <br /> (2) Test data from a single trial batch of 0 . 10 yd3 minimum is required, <br /> which demonstrates that the draincrete produced using the proposed mix , designated ingredients , <br /> and designated water-cement ratio meets the requirements of this Section . <br /> 446-3 . 2 Batch Adjustment - Materials : Meet the theoretical yield requirements of the <br /> approved mix design . Inform the Engineer of any adjustments to the approved mix design. Note <br /> any batch adjustments and record the actual quantities incorporated into the mix, on the concrete <br /> "Delivery Ticket/Certification" form . <br /> 446-3 .3 Delivery Certification : Furnish to the Engineer a complete "Delivery <br /> Ticket/Certification" form with each batch of draincrete prior to unloading at the site . <br /> 450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION . <br /> (REV 7-2640) (FA 7-2940) (1 - 11 ) <br /> SUBARTICLE 450 - 9 . 2 (Page 482 — 483 ) is deleted and the following substituted : <br /> 450-9 . 2 Other Embedded Materials : <br /> 450-9 . 2 . 1 Inserts and Lifting Devices . <br /> 450-9 .2 . 1 . 1 Placement : Locate inserts and lifting devices in accordance <br /> with the tolerances listed in 450 -2 . 1 . <br /> 450-9 .2 . 1 . 2 Corrosion Protection : Provide corrosion protection for <br /> embedded metal lifting devices that would remain exposed after construction . <br /> - 143 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />