Laserfiche WebLink
t <br /> 455 STRUCTURES FOUNDATIONS . " <br /> (REV 64440) (FA 7-2940) ( 141 ) <br /> SUBARTICLE 45511117 . 5 (Page 544) is deleted and the following substituted : <br /> 455-7 . 5 Preparation for Transportation : Cut any strands protruding beyond the ends of <br /> the pile flush with the surface of the concrete using an abrasive cutting blade before transporting <br /> the piles from the casting yard. <br /> Cut and patch the metal lifting devices in accordance with 450-9 . 2 . 1 . f <br /> SUBARTICLE 455 - 16 . 4 (Pages 570 and 571 ) is deleted and the following substituted : <br /> 455- 16 .4 Cross-Hole Sonic Logging (CSL) Tubes : Install CSL access tubes full length <br /> in all drilled shafts from the tip of shaft to a point high enough above top of shaft to allow cross - <br /> hole- sonic-logging testing, but not less than 30 inches above the top of the drilled shaft, ground <br /> surface or water surface , whichever is higher. Equally space tubes around circumference of <br /> drilled shaft . Securely tie access tubes to the inside of the reinforcing cage and align tubes to be p <br /> parallel to the vertical axis of the center of the cage . Access tubes must be NPS 1 1 /2 <br /> Schedule 40 black iron or steel (not galvanized) pipe . Ensure that the CSL access tubes are free <br /> from loose rust, scale , dirt, paint, oil and other foreign material . Couple tubes as required with <br /> threaded couplers , such that inside of tube remains flush . Seal the bottom and top of the tubes <br /> with threaded caps . The tubes , joints and bottom caps shall be watertight . Seal the top of the <br /> tubes with lubricated, threaded caps sufficient to prevent the intrusion of foreign materials . <br /> Stiffen the cage sufficiently to prevent damage or misalignment of access tubes during the lifting <br /> and installation of the cage . Repair or replace any unserviceable tube prior to concreting . <br /> Exercise care in removing the caps from the top of the tubes after installation so as not to apply <br /> excess torque , hammering or other stress which could break the bond between the tubes and the <br /> concrete . <br /> Provide the following number (rounded up to the next whole number of tubes) <br /> and configuration of cross-hole sonic logging access tubes in each drilled shaft based on the <br /> diameter of the shaft . <br /> Shaft Diameter Number of Tubes Required Configuration around the inside <br /> of Circular Reinforcing Cage <br /> 36 to 48 inches 4 90 degrees apart <br /> Greater than 48 inches 1 tube per foot 360 degrees divided by the <br /> of Shaft Diameter Number of Tubes <br /> Insert simulated or mock probes in each cross -hole - sonic access tube prior to <br /> concreting to ensure the serviceability of the tube . Fill access tubes with clean potable water and <br /> recap prior to concreting . Repair or replace any leaking, misaligned or damaged tubes as in a <br /> manner acceptable to the Engineer prior to concreting . <br /> For drilled shaft foundations requiring anchor bolts, verify CSL access tubes will <br /> not interfere with anchor bolt installation before excavating the shaft . When CSL access tube <br /> locations conflict with anchor bolt locations , move the CSL access tube location +/- two inches <br /> - 145 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />