My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OOL <br /> In <br /> le <br /> z ° ..k "� a ? fr , 4+ > n <br /> Cationic polyacrylamide shall not be used in any concentration . Do not spray polyacrylamide <br /> gil containing mixtures onto pavement. These may include tackifiers , flocculants or moisture - <br /> holding compounds . <br /> 570-3 . 5 Bonded Fiber Matrix (BFM) : Meet the minimum physical and performance <br /> In <br /> criteria of this Specification for use of BFM in hydroseeding operations or temporary non- <br /> vegetative erosion and sediment control methods . <br /> Provide evidence of product performance testing, manufacturer ' s certification of <br /> training and material samples to the Engineer at least seven calendar days prior to installation . <br /> Provide documentation to the Engineer of manufacturer ' s testing at an <br /> independent laboratory, demonstrating superior performance of BFM as measured by reduced <br /> water runoff, reduced soil loss and faster seed germination in comparison to erosion control <br /> blankets . <br /> Use only BFMs that contain all components pre-packaged by the manufacturer to <br /> assure material performance . Deliver materials in UV and weather resistant factory labeled <br /> packaging. Store and handle products in strict compliance with the manufacturer ' s directions . <br /> When polyacrylamide is used as part of hydroseeding mix, only anionic polymer <br /> formulation with free acrylamide monomer residual content of less than 0 . 05 % is allowed . <br /> Cationic polyacrylamide shall not be used in any concentration . Do not spray polyacrylamide <br /> containing mixtures onto pavement. These may include tackifiers , flocculants or moisture- <br /> holding compounds . <br /> Meet the following requirements after application of the formed matrix : <br /> Ensure that the tackifier does not dissolve or disperse upon re -wetting . <br /> Ensure that the matrix has no gaps between the product and the soil and <br /> that it provides 100 % coverage of all disturbed soil areas after application . <br /> Ensure that the matrix has no germination or growth inhibiting properties <br /> and does not form a water-repelling crust. <br /> Ensure that the matrix is comprised of materials which are 100 % <br /> biodegradable and 100 % beneficial to plant growth . <br /> Mix and apply the BFM in strict compliance with the manufacturer ' s <br /> recommendations . <br /> Apply the BFM to geotechnically stable slopes at the manufacturer ' s <br /> recommended rates . <br /> Degradation of BFM will occur naturally as a result of chemical and biological <br /> hydrolysis , UV exposure and temperature fluctuations . Re -application, as determined by the <br /> Engineer, will be required if BFM-treated soils are disturbed or water quality or turbidity tests <br /> show the need for an additional application . The work and materials for re- application, will be <br /> paid for as Unforeseeable Work. <br /> 570-3 . 6 Watering : Water all turf areas as necessary to produce a healthy and vigorous <br /> stand of turf. Ensure that the water used for turf irrigation meets the requirements of Section 983 . <br /> 570-3 . 7 Fertilizing : Fertilize as necessary based on soil testing performed in accordance <br /> with Section 162 . Refer to Section 982 for fertilizer rates . <br /> For bid purposes , base estimated quantities on an initial application of 265 <br /> lbs/acre and one subsequent application of 135 lbs/acre of 16 - O- 8 . <br /> . 1 68 - <br /> FPID ( S ) : 4231864 - 58 - 01 <br /> e InJ177W `7717% , <br />
The URL can be used to link to this page
Your browser does not support the video tag.