My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 1 <br /> asphalt concrete mix or concrete pavement mix so as to restore the roadway to the satisfaction of <br /> the Engineer. <br /> When removing non-intrusive detectors that are not embedded in or under <br /> pavement, remove the roadside detector assembly, cabling, mounting hardware, and detector <br /> electronics in cabinet. <br /> (b) Pedestrian Detector Assemblies : Include in the removal of pedestrian detector <br /> assemblies the removal of the push button detector, sign, and all mounting hardware , including <br /> the supporting post and foundation . <br /> 6904 .6 Removal of Mast Arms and Span Wires : Disconnect the mast arms and span <br /> wires carefully at the pole , and salvage all usable hardware and attachment devices as <br /> determined by the Engineer. Remove all devices supported by the mast arm or span wire <br /> (including wiring) prior to the removal of the mast arm or span wire . <br /> For integrally installed mast arms and mast arm poles , remove the pole and mast <br /> arm combination as a unit after removing the devices supported by the mast arms . <br /> 6904 . 7 Removal of Cabling and Conduit : After removing the conductor cable and <br /> conduit, carefully stub , or protect with other appropriate procedures, the remaining conductor <br /> cable and conduit at the point of removal . <br /> If the removal of any cables and conduit requires excavation , restore disturbed <br /> areas compatible with adjacent ground areas . <br /> 690-5 Transporting and Storing Removed Equipment. <br /> When the Contract Documents specify special handling, deliver equipment and materials <br /> that are not stipulated to be reused in the new installations to the location( s) designated in the <br /> Contract. When the Contract Documents note no special handling, stockpile or dispose of the <br /> removed materials as approved by the Engineer. The Engineer will determine ownership of <br /> removed equipment and will approve of the removal of any salvaged equipment from the project <br /> in advance . <br /> Provide disposal areas , and dispose of removed concrete strain 1 <br /> p p poles in such areas . <br /> p <br /> 690-6 Method of Measurement. <br /> 690-6 . 1 General : The quantities to be paid for will be measured in accordance with the <br /> different work tasks required in this Section . The Contract unit price for each different work task <br /> as specified in the Contract Documents will include all labor and equipment required to remove <br /> f the specified items specified by the Pay Item Numbers . <br /> 690-6 .2 Remove Poles : <br /> 690-6.2 . 1 Pole Removal Shallow : The quantity to be paid for will be the removal <br /> of each pole including the foundation and all accessories or attachments to a depth not less than <br /> 4 feet below existing grade . <br /> 690-6 .2 . 2 Pole Removal Deep : The quantity to be paid for will be the complete <br /> removal of the pole and foundation including all accessories or attachments . <br /> 690- 6 .3 Remove Signal Pedestal : The quantity to be paid for will be the complete <br /> removal of each pedestal including the foundation and all accessories or attachments . <br /> 690-7 Basis of Payment. <br /> Prices and payments will be full compensation for all work specified in this Section . <br /> Payment will be made under : <br /> Item No . 690- 10- Remove Traffic Signal Head Assembly - each . <br /> . 1 82 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.