My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer . Cost for removing conflicting pavement markings during maintenance of traffic <br /> operations to be included in Maintenance of Traffic , Lump Sum . <br /> Before applying traffic stripes and markings , remove any material by a method <br /> approved by the Engineer that would adversely affect the bond of the traffic stripes . Before <br /> applying traffic stripes to any Portland cement concrete surface , apply a primer, sealer or surface <br /> preparation adhesive of the type recommended by the manufacturer . Offset longitudinal lines at <br /> least 2 inches from any longitudinal joints of Portland cement concrete pavement . <br /> Apply traffic stripes or markings only to dry surfaces , and when the ambient air <br /> and surface temperature is at least 50°F and rising for asphalt surfaces and 60 ° F and rising for <br /> concrete surfaces . <br /> Apply striping to the same tolerances in dimensions and in alignment specified in <br /> 710- 5 . When applying traffic stripes and markings over existing markings , ensure that not more <br /> than 2 inches on either end and not more than 1 inch on either side of the existing line is visible . <br /> Apply thermoplastic material to the pavement either by spray, extrusion or other <br /> means approved by the Engineer. <br /> Conduct field tests in accordance with FM 5 - 541 . Remove and replace traffic <br /> stripes and markings not meeting the requirements of this Section at no additional cost to the ° <br /> Department . <br /> Apply all final pavement markings prior to opening the road to traffic . <br /> SUBARTICLE 711 -4 . 3 (Page 802 ) is deleted and the following substituted : <br /> 711 -4 .3 Retroreflectivity : Apply white and yellow traffic stripes and markings that will <br /> attain an initial retroreflectivity of not less than 450 mcd/lx • m2 and not less than 350 mcd/lx • m2 , `. <br /> respectively for all longitudinal lines . All transverse lines , messages and arrows will attain an F <br /> initial retroreflectivity of not less than 300 mcd/lx • rn and 250 mcd/lx • rn for white and yellow <br /> respectively. All pedestrian crosswalks , bike lane symbols or messages in a proposed bike lane 1 <br /> shall attain an initial retroreflectivity of not less than 275 mcd/lx , m2 . <br /> Measure , record and certify on Department approved form and submit to the <br /> Engineer, the retroreflectivity of white and yellow pavement markings in accordance with <br /> Florida Method FM- 5 - 541 . <br /> The Department reserves the right to test the markings within three days of receipt <br /> of the Contractor ' s certification . The test readings should be representative of the Contractor ' s g <br /> striping performance . If the retroreflectivity values measure below values shown above , the <br /> striping will be removed and reapplied at the Contractor ' s expense . <br /> i <br /> ARTICLE 711 -7 (Page 803 ) is deleted and the following substituted : <br /> 711 -7 Observation Period . <br /> Pavement markings are subject to a 180 day observation period under normal traffic . The <br /> observation period shall begin with the satisfactory completion and acceptance of the work . <br /> The pavement markings shall show no signs of failure due to blistering , excessive <br /> cracking, chipping, discoloration, poor adhesion to the pavement, loss of reflectivity or vehicular <br /> t ' vi shall meet the initial requirements of 711 -4 . 3 . The Department <br /> damage . The retroreflectivity ty q <br /> reserves the right to check the color and retroreflectivity any time prior to the end of the <br /> observation period . <br /> - 199 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br /> sr , <br />
The URL can be used to link to this page
Your browser does not support the video tag.