Laserfiche WebLink
1 rIN I <br /> r; a � ° r �.'€ e r r ' I NNI NN <br /> n c 43 <br /> x <br /> .. It, <br /> NZIa <br /> r., . - =.c <br /> .. -+' ( a z,a r.,4 ,aa '.. . , ,+ ` . wu+ 3 + . , , t .. 'a., ' z a ;ti.: ,�"n,. €.. <br /> atY. - . '•: -n ,t��� ,c; � -s L <br /> : h't' t "�" % a-r�., ``. 'rrrr ,1 ,. 'd ,,i , r,;' `x`°^"3-s ` 3x�a?? ,..'. k ;v k�, <br /> ,' acs. ` t N , NIN .AN <br /> IN IN <br /> SUPERPAVE PG ASPHALT BINDER <br /> Specification <br /> Test and Method Conditions Minimum/Maximum <br /> Value <br /> Original Binder <br /> Superpave PG Asphalt <br /> Binder Grade Report <br /> Qualified Products List <br /> IN Number Report <br /> Polymer Modifier Type (PG 76 -22 Only) Report <br /> Solubility, AASHTO T 44 in Trichloroethylene Minimum 99 . 0 % <br /> Flash Point, AASHTO T 48 COC Minimum 450°F IN <br /> Rotational Viscosity, 275 °F Maximum 3 Pa- s <br /> AASHTO T 316 <br /> Absolute Viscosity, 140°F Max . 2400 P (PG 64 -22) <br /> AASHTO T 202 Max . 3600 P (PG 67 - 22 ) IN <br /> IN <br /> Dynamic Shear Rheometer G /sin S, Test Temperature @ <br /> 10 rad/sec , ° C Minimum 1 . 00 kPa IN <br /> AASHTO T 315 phase Angle , b , (PG 76 -22 Only) Maximum 75 degrees <br /> IN Rolling Thin Film Oven Test Residue (AASHTO T 240) <br /> Rolling Thin Film Oven , IN I <br /> AASHTO T 240 Mass Loss % Maximum 0 . 50 <br /> Dynamic Shear Rheometer, G /sin 6 , Test Temperature @ <br /> AASHTO T 315 10 rad/sec, ° C Minimum 2 . 20 kPa IN I <br /> Pressure Aging Vessel Residue (AASHTO R 28 ) at 100°C <br /> Dynamic Shear Rheometer, G sin S , Maximum 5000 kPa <br /> AASHTO T 315 10 rad/sec . 25 ° C <br /> S ( Stiffness) , @ <br /> Creep Stiffness , 60 sec . @ - 12 ° C Maximum 300 Mpa <br /> AASHTO T 313 M-value , @ <br /> 60 sec . @ - 12 ° C Minimum 0 . 300 <br /> IN <br /> IN IN <br /> 9164 .3 . 5 Notification and Evaluation : In the event that a Specification <br /> Compliance test is outside specification requirements or a Quality Control test is outside limits <br /> established by the supplier as part of his Quality Control Program shipments of that product to <br /> Department projects will cease immediately and the Contractor and the State Materials Office <br /> will be notified and the product retested for Specification Compliance (resampling as <br /> appropriate) . Where the retest for Specification Compliance meets all requirements , shipments of <br /> that product may resume . Where off. specification material has been shipped and the retest <br /> confirms the original test, the Contractor and State Materials Office will be informed of the steps <br /> taken to achieve specification compliance on the product shipped . <br /> Where off- specification materials has been shipped, further shipment of <br /> that product to Department projects shall remain suspended until the cause of the problem is <br /> evaluated and corrected by the supplier to the satisfaction of the State Materials Engineer. <br /> - 208 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> i as �, "`m a t " t g i �` r v s. <br /> „ � x � .;. . .,_ xm- � , . �. e. : 2 � ,hi X .` Z, ,.. .k.` ,. . . , � �, w.. . n .. , � ,,. ,. � ., <br />. . 11 � . s .,., <br />