My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s e. y:p'ti• 7 ,x �. 'v�" 1 �".�'S�.N' `�". a a a �� A ,^., `9" � ^ . a i ° <br /> z rc � .a n J` . � i a '� r <br /> z a ,... t �' € :> "'- s ,�` u� i�x � as :z' 3 , , ,x a 3. s€` r <br /> ..s '� r .. _ , x -�•. : � <br /> � � '� �� < � .`'ta * r ; n�,s` � 44�` � �,� '� "s,. � `� �'�-'3 "x r � • ,: r k x € .r <br />: .x �°� .. a.�, a - <br /> `; a was �� =.' «��x ,`�.', � � �� ppm x � ay w� u�a,"i � r .,� �• s a <br /> . .t ,„.� - � .:� : �: , r <br /> F <br /> 17777777 <br /> Table 1 <br /> Oxidation Resistance of Pipes <br /> Pipe Location Test Method Test Conditions Requirement <br /> 2 replicates (to determine <br /> Liner and/or OIT Test (ASTM D - initial OIT value) on the as <br /> Crown? 3895 ) manufactured (not incubated) 25 . 0 minutes , minimum <br /> pipe . <br /> Incubation test FM Three samples for incubation 9510 <br /> Liner and/or of 195 days at 176 ° F8 and Average of 3 . 0 minutes <br /> Crown' 5 -574 and OIT test pplied stress of 250 psi . One (no values shall be less than <br /> (ASTM D-3895 ) OIT test per each sample 2 . 0 minutes) <br /> MI test 2 replicates on the as <br /> Liner and/oranufactured (not incubated) <br /> Crown? (ASTM D- 1238 at < 0. 4 g/ 10 minutes <br /> p <br /> 190°C/2 . 16 Kg) pipe . <br /> Incubation test FM 2 replicates on the three aged l0, 11 , 12 <br /> Liner and/or 5 - 574 and MI test sampled after incubation of MI Retained Value <br /> Crown' (ASTM D4238 195 days at 176 °F8 and shall be greater than 80 % <br /> at 190°C/2 . 16 Kg) applied stress of 250 psi and less than 120% . <br /> Note : FM = Florida Method of Test. 1 Required only when the resin used in the corrugation is different than that of the liner <br />. <br /> A higher test temperature ( 194° F) may be used if supporting test data acceptable to the State Materials Engineer is submitted <br /> and approved in writing. <br /> Full test shall be performed on alternative pipe diameter of pipe based on wall profile design, raw material cell classification , <br /> and manufacturing process. Full test must be performed on maximum and minimum pipe diameters within a manufacturing <br /> rocess. <br /> Computer program to predict the 100 year SCR with 95 % lower confidence can be obtained from FDOT. <br /> 5 Single test for the junction and longitudinal profile may be used on alternating pipe sizes within a manufacturing process. <br /> Single point tests may not be used on maximum and minimum pipe sizes within a manufacturing process except by approval of <br /> he Engineer. Single point tests may be used for quality assurance testing purposes . <br /> Longitudinal profiles include vent holes and molded lines . <br /> 7 OIT and MI tests on the crown are required when resin used in the corrugation is different than that of the liner. <br /> 8 The incubation temperature and duration can also be 136 days at 185 °F. <br /> Within each replicate set of tests, the discrepancy range shall be within 6% . If an out -of range discrepancy occurs, repeat <br />the <br /> three OIT tests. <br /> 10 The tests for incubated and "as-manufactured" pipe samples shall be performed by the same lab , same operator, the same <br /> esting device, and in the same day. <br /> 11 Within each replicate set of tests , the discrepancy range shall be within 9 %. If an out-of-range discrepancy occurs, <br />repeat the <br /> o MI tests on the same pipe sample. If insufficient material is available, a repeat of one test is acceptable. <br /> 12 The MI retained value is detenn <br /> nuined using the average MI value of incubated sample divided by the average MI value of as - <br /> afactured pipe sample . <br /> Manufacturer may use ground class II, but not class I, pipe for reworked <br /> plastic . <br /> 948-2 .3 .3 Certification : Furnish to the Engineer certification from the <br /> manufacturer for each pipe diameter manufacturers LOT to be incorporated into the project that <br /> the pipe meets the requirements of these Specifications . <br /> Manufacturers seeking evaluation of a product in accordance with Departmental <br /> procedures must submit test reports conducted by a laboratory qualified by the Geosynthetic <br /> Accreditation Institute- Laboratory Accreditation Program (GAI- LAP) or qualified by ISO 17025 <br /> accreditation agency using personnel with actual experience running the test methods for class II <br /> HDPE pipe . Submit the test reports to the State Materials Office . <br /> - 220 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> t � �"�c� �i ; n a �`k� �:4 ,�+� �`�� 4� �.f f t c� t � '' F . s• „ ro <br /> _ x e r �,.', `r �� ".,.� � '<. <br /> aA <br /> . ,... , ,, 11 . .ti .. _ . „ k.�fi, r�.. 1 :;^', w.. .>, <br />
The URL can be used to link to this page
Your browser does not support the video tag.