My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B.1
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:18:33 PM
Creation date
10/1/2015 3:12:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B.1
Agenda Item Number
8.N.
Entity Name
Goodson Paving
Subject
Contract and Specifications Old Dixie Sidewalk
Volume II
Area
Old Dixie Highway from 38th Lane to 65th St.
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10419
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
102 MAINTENANCE OF TRAFFIC . <br /> (REV 84040) (FA 84640) (141 ) <br /> SECTION 102 (Pages 109- 126) is deleted and the following substituted : <br /> SECTION 102 <br /> MAINTENANCE OF TRAFFIC <br /> 1024 Description . <br /> Maintain traffic within the limits of the project for the duration of the construction period, <br /> including any temporary suspensions of the work. Construct and maintain detours . Provide <br /> facilities for access to residences , businesses , etc . , along the project . Furnish, install and maintain <br /> traffic control and safety devices during construction . Furnish and install work zone pavement <br /> markings for maintenance of traffic in construction areas . Provide any other special requirements <br /> for safe and expeditious movement of traffic specified on the plans . Maintenance of Traffic <br /> includes all facilities , devices and operations as required for safety and convenience of the public <br /> within the work zone . <br /> Do not maintain traffic over those portions of the project where no work is to be <br /> accomplished or where construction operations will not affect existing roads . Do not obstruct or <br /> create a hazard to any traffic during the performance of the work, and repair any damage to <br /> existing pavement open to traffic . <br /> Include the cost of any work that is necessary to meet the requirements of the Contract <br /> Documents under the MOT pay item, when there is not a pay item provided. <br /> 102.2 Materials . <br /> Meet the following requirements : <br /> Bituminous Adhesive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section 970 <br /> Temporary Retroreflective Pavement Markers . . ' Section 990 <br /> Paint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . Section 971 <br /> Removable Tape . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . Section 990 <br /> Glass Spheres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . Section 971 <br /> Temporary Traffic Control Device Materials . . . . . Section 990 <br /> Retroreflective and Nonreflective Sheeting <br /> for Temporary Traffic Control Devices . . . . . . . . . . . . . . Section 994 <br /> 102-2 . 1 Temporary Traffic Control Devices : Use only the materials meeting the <br /> requirements of Section 990 , Section 994 , Design Standards and the MUTCD . <br /> 102-2 . 2 Detour : Provide all materials for the construction and maintenance of all <br /> detours . <br /> 102 -2 .3 Commercial Materials for Driveway Maintenance : Provide materials of the <br /> type typically used for base, including recycled asphalt pavement material, and having stability <br /> and drainage properties that will provide a firm surface under wet conditions . <br /> 102-3 Specific Requirements . <br /> 102 -3 . 1 Beginning Date of Contractor ' s Responsibility : Maintain traffic starting the <br /> day work begins on the project or on the first day Contract time is charged, whichever is earlier . <br /> -22 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.