Laserfiche WebLink
required toxicity testing information in accordance with the E& SC Manual to the Engineer for <br /> review and acceptance prior to using any chemical treatment on the project site . <br /> 104-6 .5 Removal of Temporary Erosion Control Features : In general, remove or <br /> incorporate into the soil any temporary erosion control features existing at the time of <br /> construction of the permanent erosion control features in an area of the project in such a manner <br /> that no detrimental effect will result . The Engineer may direct that temporary features be left in <br /> place . <br /> 104-6 . 6 Signed and Sealed As-Built Drawings : Prior to final acceptance of the project, <br /> submit to the Engineer three copies of as-built drawings and a certified survey verifying the as . <br /> built conditions for all installed and constructed surface water management systems . The as -built <br /> drawings and certified survey must satisfy all the requirements and special conditions listed in <br /> the Water Management District ' s Environmental Resource Permit (ERP ) and any applicable <br /> local permit . The as -built drawings and certified survey must be signed and sealed by an <br /> appropriately licensed professional registered in the State of Florida. <br /> If the ERP does not contain specific requirements , provide as -built drawings with <br /> the following information as a minimum . <br /> 1 . Discharge structures : structure identification number, type , locations (latitude <br /> and longitude) , dimensions and elevations of all , including weirs , bleeders , orifices , gates , <br /> pumps , pipes , and oil and grease skimmers . <br /> 2 . Side bank and underdrain filters , or exfiltration trenches : locations , dimensions <br /> and elevations of all, including clean-outs , pipes, connections to control structures and points of <br /> discharge to receiving waters . <br /> 3 . Storage areas for treatment and attenuation : storage area identification number, <br /> dimensions , elevations , contours or cross- sections of all , sufficient to determine stage - storage <br /> relationships of the storage area and the permanent pool depth and volume below the control <br /> elevation for normally wet systems . <br /> 4 . System grading : dimensions , elevations , contours , final grades or cross - sections <br /> to determine contributing drainage areas , flow directions and conveyance of runoff to the system <br /> discharge points . <br /> 5 . Conveyance : dimensions , elevations , contours , final grades or cross - sections of <br /> systems utilized to divert off- site runoff around or through the new system . <br /> 6 . Water levels : existing water elevations and the date determined . <br /> 7 . Benchmarks : location and description (minimum of one per major water <br /> control structure) . <br /> 1044 Maintenance of Erosion and Sediment Control Features . <br /> 104-7 . 1 General : Provide routine maintenance of permanent and temporary erosion and <br /> sediment control features , at no expense to the Department, until the project is complete and <br /> accepted. If reconstruction of such erosion and sediment control features is necessary due to the <br /> Contractor ' s negligence or carelessness or, in the case of temporary erosion and sediment control <br /> features , failure by the Contractor to install permanent erosion control features as scheduled, the <br /> Contractor shall replace such erosion control features at no expense to the Department . If <br /> reconstruction of permanent or temporary erosion and sediment control features is necessary due <br /> to factors beyond the control of the Contractor, the Department will pay for replacement under <br /> the appropriate Contract pay item or items . <br /> Inspect all erosion and sediment control features at least once every seven <br /> calendar days and within 24 hours of the end of a storm of 0 . 50 inches or greater. Maintain all <br /> -41 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br />