Laserfiche WebLink
own forces to provide the necessary corrective measures . Any such costs incurred, including <br /> engineering costs , will be charged to the Contractor and appropriate deductions made from the <br /> monthly progress estimate . <br /> Payment will be made under : <br /> Item No . 104- 1 - Artificial Coverings/ Rolled Erosion Control Products - per <br /> square yard. <br /> Item No . 104 - 6- Slope Drains (Temporary)/ Runoff Control Structures an per <br /> foot. <br /> Item No . 104- 7 - Sediment Basins/ Containment Systems - each . <br /> Item No . 104 - 9- Sediment Basin/ Containment system Cleanouts - each . <br /> Item No . 104- l0 - Sediment Barriers — per foot <br /> Item No . 104- 11 - Floating Turbidity Barrier - per foot . <br /> Item No . 104- l2 - Staked Turbidity Barrier - per foot. <br /> Item No . 104- 18 Inlet Protection System each . <br /> Item No . 104- 19 Chemical Treatment — per square yard . <br /> Item No . 104 — 20 Chemical Treatment (floc logs , drums of product) - each . <br /> 105 CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS . <br /> (REV 5-2440) (FA 84640) (141 ) <br /> SUBARTICLE 105 -3 . 1 (Pages 137 — 138 ) is deleted and the following substituted : <br /> 105-3 . 1 General : Certain operations require personnel with specific qualifications . <br /> Certain materials require production under an approved Quality Control (QC) Plan to ensure that <br /> these materials meet the requirements of the Contract Documents . Applicable materials include <br /> hot mix asphalt, Portland cement concrete ( Structural) , earthwork, cementitious materials , <br /> timber, steel and miscellaneous metals , galvanized metal products , prestressed and/or precast <br /> concrete products and drainage products . For all applicable materials included in the Contract, <br /> submit a QC Plan prepared in accordance with the requirements of this Section to the Engineer. <br /> Do not incorporate any of these materials into the project prior to the Engineer ' s approval of the <br /> QC Plan . <br /> Steel and Miscellaneous Metal products , including aluminum, are defined as the <br /> metal components of bridges , including pedestrian and moveable bridges , overhead and <br /> cantilevered sign supports , ladders and platforms , bearings , end wall grates , roadway gratings, <br /> drainage items , expansion joints , roadway decking, shear connectors , handrails , galvanized <br /> products , fencing, guardrail , light poles , high mast light poles , standard mast arm assemblies and <br /> Monotube assemblies , stay in-place forms , casing pipe , strain poles , fasteners , connectors and <br /> other hardware . <br /> When accreditation or certification is required, make supporting documents from <br /> the two previous inspections performed by the accrediting or certifying agency available to the <br /> Department upon request . <br /> Obtain Department approval prior to beginning production . Meet and maintain the <br /> approved Quality Control Program requirements at all times . Production and construction of <br /> these products without the Department ' s prior approval of a Quality Control Program may result <br /> in rejection of the products . Continued approval will be subject to satisfactory results from <br /> -43 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br /> 5� <br />