Laserfiche WebLink
¢gypp <br /> not start any work at the off- site construction activity area prior to receiving clearance from the <br /> DHR that no additional research is warranted. <br /> For certain locations , the DHR will require a Cultural Resources Assessment <br /> Survey before approval can be granted. When this is required, secure professional archaeological <br /> services to complete an historical and archaeological survey report. Submit the report to the <br /> DHR with a copy to the Department. The Engineer will determine final approval or rejection of <br /> off- site construction activity areas based on input from the DHR. <br /> Before receiving approval or before use of borrow areas , obtain written clearance <br /> from the engineer concerning compliance with the Federal Endangered Species Act and other <br /> Wildlife Regulations as specified in 7 - 1 . 4 and Section 4(f) of the USDOT Act as specified in <br /> 7 - 1 . 8 . <br /> The Department will adjust Contract Time in accordance with 8 - 7 for any <br /> suspension of operations required to comply with this Article . The Department will not accept <br /> any monetary claims due to delays or loss of off-site construction activity areas . <br /> Except where the plans specifically call for the use of a particular borrow or <br /> dredging area, the Contractor may substitute borrow or dredging areas of his own choosing <br /> provided : ( 1 ) the Engineer determines the materials from such areas meet the Department ' s <br /> standards and other requirements for stability for use in the particular sections of the work in <br /> which it is to be placed, and (2 ) the Contractor absorbs any increase in hauling or other costs . <br /> Stake the corners of the proposed borrow area and provide the necessary equipment along with <br /> an operator in order for the Engineer to investigate the borrow area. The Engineer will determine <br /> test locations , collect samples , and perform tests to investigate the proposed borrow area based <br /> on soil strata and required soil properties . The Engineer will approve use of materials from the <br /> proposed area based on test results and project requirements . Final acceptance of materials will <br /> be based on Point of Use Test as described in 6- 1 . 2 . 4 . <br /> Before using any borrow material from any substitute areas , obtain the Engineer ' s <br /> approval, in writing, for the use of the particular areas , and, where applicable , ensure that the <br /> Engineer has cross - sectioned the surface . Upon such written approval by the Engineer, consider <br /> the substitute areas as designated borrow areas . <br /> When furnishing the dredging or borrow areas , supply the Department with <br /> evidence that the necessary permits , rights , or waivers for the use of such areas have been <br /> secured. <br /> Do not excavate any part of a Contractor furnished borrow area which is less than <br /> 300 feet from the right-of--way of the project or any State Road until the Engineer has approved a <br /> plan for landscaping and restoring the disturbed area. Perform this landscaping and land <br /> restoration at no expense to the Department, prior to final acceptance of the project . Do not <br /> provide a borrow area closer than 25 feet to the right-of-way of any state road. In Department <br /> furnished borrow pits , do not excavate material within 5 feet of adjacent property lines . <br /> Upon completion of excavation, neatly shape, dress , grass , vegetate , landscape , <br /> and drain all exposed areas including haul roads , as necessary so as not to present an <br /> objectionable appearance . <br /> Meet the requirements of Section 104 when furnishing borrow areas , regardless of <br /> location . <br /> - 53 - <br /> FPID ( S ) : 423186 - 1 - 58 - 01 <br />