Laserfiche WebLink
;14 <br /> SECTION 1 — DEFINITIONS AND TERMS <br /> Contractor ' s Engineer of Record . <br /> A Professional Engineer registered in the State of Florida, other than the Engineer of <br /> Record or his subcontracted consultant, who undertakes the design and drawing of components <br /> of the permanent structure as part of a redesign or Cost Savings Initiative Proposal , or for repair <br /> designs and details of the permanent work . The Contractor ' s Engineer of Record may also serve <br /> as the Specialty Engineer , <br /> The Contractor ' s Engineer of Record must be an employee of a pre -qualified firm . The <br /> firm shall be pre- qualified in accordance with the Rules of the Department of Transportation , <br /> Chapter 14 - 75 . Any Corporation or Partnership offering engineering services must hold a <br /> Certificate of Authorization from the Florida Department of Business and Professional <br /> Regulation . <br /> As an alternate to being an employee of a pre- qualified firm, the Contractor ' s Engineer of <br /> Record may be a pre -qualified Specialty Engineer. For items of the permanent work declared by <br /> the State Construction Office to be "major" or " structural" , the work performed by a pre - <br /> qualified Specialty Engineer must be checked by another pre - qualified Specialty Engineer . An <br /> individual Engineer may become pre- qualified in the work groups listed in the Rules of the <br /> Department of Transportation , Chapter 14 - 75 , if the requirements for the Professional Engineer <br /> are met for the individual work groups . Pre -qualified Specialty Engineers are listed on the State <br /> Construction Website . Pre - qualified Specialty Engineers will not be authorized to perform <br /> redesigns or Cost Savings Initiative Proposal designs of items fully detailed in the plans . <br /> Department : <br /> Indian River County, Public Works Department <br /> Engineer . <br /> Indian River County ' s Public Works Director, acting directly or through duly authorized <br /> representatives ; such representatives acting within the scope of the duties and authority assigned <br /> to them . <br /> Note : In order to avoid cumbersome and confusing repetition of expressions in these <br /> Specifications , it is provided that whenever anything is , or is to be done , if, as , or, when , or <br /> where "acceptable , accepted, approval , approved, authorized, condemned, considered necessary, <br /> contemplated, deemed necessary, designated, determined, directed, disapproved, established, <br /> given, indicated, insufficient, ordered, permitted, rejected, required, reserved, satisfactory, <br /> specified, sufficient, suitable , suspended, unacceptable , or unsatisfactory, " it shall be understood <br /> as if the expression were followed by the words "by the Engineer, " "to the Engineer, " or "of the <br /> Engineer. " <br /> Lot <br /> The definition varies throughout the specifications . The Engineer reserves the right to <br /> define the testing limits . <br /> Qualified Products List ( QPL ) <br /> The FDOT ' s Qualified Products List <br /> - 6 - <br /> FPID (S ) : 423186 - 1 - 58 - 01 <br />