Laserfiche WebLink
TypeSP -9 . 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 1 1 /2 - 2 inches <br /> TypeSP - 12 . 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . 2 - 3 inches <br /> Type SP - 19 . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> - 3 1 /2 inches <br /> In addition to the minimum and maximum thickness requirements , the <br /> following restrictions are placed on coarse mixes when used as a structural course : <br /> Type SP- 19 . 0 - May not be used in the final (top) structural layer. <br /> 3344 .4.3 Additional Requirements : The following requirements also apply to <br /> coarse and fine Type SP Asphalt Concrete mixtures : <br /> 1 . A minimum 1 1 /2 inch initial lift is required over an Asphalt Rubber <br /> Membrane Interlayer (ARMI) . <br /> 2 . When construction includes the paving of adjacent shoulders (<_5 feet <br /> wide) , the layer thickness for the upper pavement layer and shoulder must be the same and paved <br /> in a single pass , unless called for differently in the Contract Documents . <br /> 3 . All overbuild layers must be fine Type SP Asphalt Concrete designed at <br /> the traffic level as stated in the Contract . Use the minimum and maximum layer thicknesses as <br /> specified above unless called for differently in the Contract Documents . On variable thickness <br /> overbuild layers , the minimum allowable thickness may be reduced by 1 /2 inch, and the <br /> maximum allowable thickness may be increased 1 /2 inch, unless called for differently in the <br /> Contract Documents . <br /> 334-2 Materials . <br /> 334-2 . 1 General Requirements : Meet the material requirements specified in <br /> Division III. Specific references are as follows : <br /> Superpave PG Asphalt Binder or <br /> Recycling Agent. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 916- 1 <br /> , 916-2 <br /> Coarse Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section <br /> 901 <br /> Fine Aggregate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . Section 902 <br /> 334-2 .2 Superpave Asphalt Binder : Unless specified otherwise in the Contract, use a <br /> PG 67 -22 asphalt binder. In addition, meet the requirements of 334 -2 . 3 . <br /> 334-2 .3 Reclaimed Asphalt Pavement (RAP) Material : <br /> 334-2 .3 . 1 General requirements : RAP may be used as a component of the <br /> asphalt mixture subject to the following requirements : <br /> 1 . When using a PG 76 -22 Asphalt Binder, limit the amount of RAP <br /> material used in the mix to a maximum of 20 percent by weight of total aggregate . As an <br /> exception, amounts greater than 20 percent RAP by weight of total aggregate can be used if no <br /> more than 20 percent by weight of the total asphalt binder comes from the RAP material . <br /> 2 . Assume full responsibility for the design, production and construction <br /> of asphalt mixes which incorporate RAP as a component material . <br /> 3 . Use RAP from an FDOT approved stockpile or RAP that has an FDOT <br /> furnished Pavement Composition Data Sheet. <br /> 4 . Provide stockpiled RAP material that is reasonably consistent in <br /> characteristics and contains no aggregate particles which are soft or conglomerates of fines . <br /> 5 . Provide RAP material having a minimum average asphalt binder <br /> content of 4 . 0 percent by weight of RAP . As an exception, when using fractionated RAP , the <br /> minimum average asphalt binder content for the coarse portion of the RAP shall be 2 . 5 percent <br /> by weight of the coarse portion of the RAP . The coarse portion of the RAP shall be the portion of <br /> - 83 - <br /> FPID (S ) : 423186- 1 - 58 - 01 <br /> tl <br />