My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
el if fv <br /> SECTION 00520 - Agreement ( Public Works ) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , ( hereinafter called <br /> OWNER) <br /> and GbodSCN PAVIWvi SNC . <br /> ( hereinafter called CONTRACTOR ) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 - WORK <br /> 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents . The Work is generally described as follows : <br /> The project will consist of construction of a 5 ' wide concrete sidewalk on the east side of Old <br /> Dixie Highway from Sta . 21 + 00 to 204 + 00 ( 38th Ln . to 65th St . ) , drainage improvements and <br /> construction of a pedestrian bridge over the Indian River Farms Water Control District ' s North <br /> Relief Canal . <br /> ARTICLE 2 - THE PROJECT <br /> 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> Project Name : Old Dixie Highway Sidewalk Improvements from 38th Lane to <br /> 65t Street . <br /> County Project Number : 0845 <br /> Project Address : Old Dixie Highway from 38th Ln . to 65th St . <br /> ARTICLE 3 — ENGINEER <br /> 3 . 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER' s representative , assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents , <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4 . 01 Time of the Essence <br /> A . All time limits for Milestones , if any, Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract . <br /> 4 . 02 Days to Achieve Substantial Completion and Final Payment <br /> A . The Work will be substantially completed on or before the 1501h day after the date when <br /> the Contract Times commence to run as provided in paragraph 2 . 03 of the General <br /> Conditions , and completed and ready for final payment in accordance with paragraph <br /> 14 . 07 of the General Conditions on or before the 180th day after the date when the <br /> Contract Times commence to run . <br /> 00520 - 2 00520 - Agreement ( Public Works ) REV 04-07 <br /> \\Fileserver2\Public\Purchasing\Bids\2010-2011 FY (2011000 )\2011045 Construction of a 5' wide concrete sidewalk and pedestrian <br /> bridge\00520 - Agreement ( Public Works ) REV 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.