My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 It IL <br /> i fl R11 1 ill I <br /> { . le - <br /> It <br /> ,K� »a17 it f I <br /> e _ <br /> ;",. e ,a <br /> G . become aware of the general nature of the work to be performed by OWNER and others <br /> at the Site that relates to the Work as indicated in the Bidding Documents ; <br /> H . correlate the information known to Bidder, information and observations obtained from <br /> visits to the Site , reports and drawings identified in the Bidding Documents , and all additional <br /> examinations , investigations , explorations , tests , studies , and data with the Bidding Documents ; <br /> I . promptly give ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work . <br /> 4 . 08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid <br /> is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods , techniques , sequences , and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents , that Bidder has <br /> given ENGINEER written notice of all conflicts , errors , ambiguities , and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work . <br /> ARTICLE 5 - PRE- BID CONFERENCE <br /> 5 . 01 The date , time , and location for a MANDATORY Pre- Bid conference , if any, are <br /> specified in the Advertisement for Bids . Representatives of OWNER and ENGINEER will be <br /> present to discuss the Project . Bidders are REQUIRED to attend and participate in the <br /> conference . ENGINEER will transmit to all prospective Bidders of record such Addenda as <br /> ENGINEER considers necessary in response to questions arising at the conference . Oral <br /> statements may not be relied upon and will not be binding or legally effective . <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> 6 . 01 The Site is identified in the Bidding Documents . All additional lands and access <br /> thereto required for temporary orarY construction facilities co <br /> nstruction equipment , or storage of <br /> materials and equipment to be incorporated in the Work are to be obtained and paid for <br /> by <br /> CONTRACTOR . Easements for permanent structures or permanent changes in existing facilities <br /> are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents , <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7 . 01 All questions about the meaning or intent <br /> of the Bidding Documents are to be <br /> submitted to ENGINEER in writing . Interpretations or clarifications considered necessary by <br /> ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all <br /> parties through the Issuing Office as having received the Bidding Documents . Questions received <br /> less than ten days prior to the date for opening of Bids may not be answered . Only <br /> questions <br /> 00200 - 4 00200 - Instructions to Bidders REV 04-07 . doc <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\0845-Old Dixie Hwy Sidewalk US1 _69th ( LAP )\Admim\bid <br /> documents\00200 - Instructions to Bidders REV 04-07 . doc <br /> 71 <br /> t -7777 <br /> it I ' 5 <br /> it <br /> II I <br /> to <br /> It <br /> k W. <br /> . . I it I I <br /> it <br /> . r. .• . <br /> h <br /> ., r . . -� .- , � .: ,. - � . . _ . ,ems... .,, . . . _ <br /> . . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.