<br /> 37 . Resident Project Representative--The 46 , Underground Facilities--All underground
<br /> authorized representative of ENGINEER who may be pipelines , conduits , ducts , cables , wires , manholes ,
<br /> assigned to the Site or any part thereof. vaults , tanks , tunnels , or other such facilities or
<br /> attachments , and any encasements containing such
<br /> 38 . Samples--Physical examples of facilities , including those that convey electricity, gases ,
<br /> materials , equipment, or workmanship that are steam , liquid petroleum products , telephone or other
<br /> representative of some portion of the Work and which communications , cable television , water, wastewater,
<br /> establish the standards by which such portion of the storm water, other liquids or chemicals ,
<br /> or traffic or
<br /> Work will be judged . other control systems .
<br /> 39 . Shop Drawings--All drawings , diagrams , 47 . Unit Price Work--Work to be paid for
<br /> on
<br /> illustrations , schedules , and other data or information the basis of unit prices .
<br /> which are specifically prepared or assembled by or for
<br /> CONTRACTOR and submitted by CONTRACTOR to 48 . Work--The entire completed construction
<br /> illustrate some portion of the Work , or the various separately identifiable parts thereof re-
<br /> quired to be provided under the Contract Documents ,
<br /> 40 . Site--Lands or areas indicated in the Work includes and is the result of performing or
<br /> Contract Documents as being furnished by OWNER providing all labor, services , and documentation
<br /> upon which the Work is to be performed , including necessary to produce such construction , and
<br /> 11 rights-of-way and easements for access thereto , and furnishing , installing , and incorporating all materials
<br /> In such other lands furnished by OWNER which are and equipment into such construction , all as required
<br /> designated for the use of CONTRACTOR . by the Contract Documents ,
<br /> 41 . Specifications--That part of the Contract 49 . Work Change Directive--A written
<br /> Documents consisting of written technical descriptions statement to CONTRACTOR issued on or after the
<br /> of materials , equipment, systems , standards , and Effective Date of the Agreement and signed by
<br /> workmanship as applied to the Work and certain OWNER and recommended by ENGINEER ordering
<br /> administrative details applicable thereto , an addition , deletion , or revision in the Work , or
<br /> responding to differing or unforeseen subsurface or
<br /> 42 . Subcontractor--An individual or entity physical conditions under which the Work is to
<br />be
<br /> having a direct contract with CONTRACTOR or with performed or to emergencies . A Work Change
<br /> any other Subcontractor for the performance of a part Directive will not change the Contract Price
<br /> or the
<br /> of the Work at the Site . Contract Times but is evidence that the parties expect
<br /> that the change ordered or documented by a Work
<br /> 43 . Substantial Completion--The time at Change Directive will be incorporated in a subse-
<br /> which the Work (or a specified part thereof) has quently issued Change Order following negotiations by
<br /> progressed to the point where , in the opinion of the parties as to its effect, if any, on the Contract Price
<br /> ENGINEER , the Work (or a specified part thereof) is or Contract Times .
<br /> sufficiently complete , in accordance with the Contract
<br /> Documents , so that the Work (or a specified part 50 . Written Amendment--A written statement
<br /> thereof) can be utilized for the purposes for which it is modifying the Contract Documents , signed by
<br /> intended . The terms " substantially complete” and OWNER and CONTRACTOR on or after the Effective
<br /> It completed " as applied to all or part of the Date of the Agreement and normally dealing with the
<br /> Work refer to Substantial Completion thereof, nonengineenng or nontechnical rather than strictly
<br /> construction - related aspects of the Contract Docu -
<br /> 44 . Supplementary Conditions--That part of ments .
<br /> the Contract Documents which amends or
<br /> supplements these General Conditions , 1 . 02 Terminology
<br /> 45 . Supplier--A manufacturer, fabricator, A. Intent of Certain Terms or Adjectives
<br /> supplier, distributor, materialman , or vendor having a
<br /> direct contract with CONTRACTOR or with any 1 . Whenever in the Contract Documents the
<br /> Subcontractor to furnish materials or equipment to be terms as allowed , " as approved , " or terms of like
<br /> incorporated in the Work by CONTRACTOR or any effect or import are used , or the adjectives
<br /> Subcontractor. " reasonable , " " suitable , " " acceptable , " " proper, "
<br /> " satisfactory , " or adjectives of like effect or import
<br /> are used to describe an action or determination of
<br /> 00700 - General Conditions REV 04-07. doc
<br /> 00700 - 7
<br /> F :APublic Works\ENGINEERING DIVISION PROJECTS\0845 -Dixie Hwy USI _69th (LAP) ROW Mapping Project (Morgan)AAdmin bid
<br /> documents\00700 - General Conditions REV 04-07 . doc
<br /> In
<br /> ?' I In
<br />
|