Laserfiche WebLink
In ki III <br /> a. , . • -n ' Y ` � �' ' �, f"�`�s N �`r ,',rk '�. ^»`. a -� r ai a <br /> - .? I ;n In ng- , * t .. x, t, , 1, ` . 3 x o„,.^,-v� t a sb +. k �w <br /> '+,,` 3 x ',",. yn' ,. <br /> 37 . Resident Project Representative--The 46 , Underground Facilities--All underground <br /> authorized representative of ENGINEER who may be pipelines , conduits , ducts , cables , wires , manholes , <br /> assigned to the Site or any part thereof. vaults , tanks , tunnels , or other such facilities or <br /> attachments , and any encasements containing such <br /> 38 . Samples--Physical examples of facilities , including those that convey electricity, gases , <br /> materials , equipment, or workmanship that are steam , liquid petroleum products , telephone or other <br /> representative of some portion of the Work and which communications , cable television , water, wastewater, <br /> establish the standards by which such portion of the storm water, other liquids or chemicals , <br /> or traffic or <br /> Work will be judged . other control systems . <br /> 39 . Shop Drawings--All drawings , diagrams , 47 . Unit Price Work--Work to be paid for <br /> on <br /> illustrations , schedules , and other data or information the basis of unit prices . <br /> which are specifically prepared or assembled by or for <br /> CONTRACTOR and submitted by CONTRACTOR to 48 . Work--The entire completed construction <br /> illustrate some portion of the Work , or the various separately identifiable parts thereof re- <br /> quired to be provided under the Contract Documents , <br /> 40 . Site--Lands or areas indicated in the Work includes and is the result of performing or <br /> Contract Documents as being furnished by OWNER providing all labor, services , and documentation <br /> upon which the Work is to be performed , including necessary to produce such construction , and <br /> 11 rights-of-way and easements for access thereto , and furnishing , installing , and incorporating all materials <br /> In such other lands furnished by OWNER which are and equipment into such construction , all as required <br /> designated for the use of CONTRACTOR . by the Contract Documents , <br /> 41 . Specifications--That part of the Contract 49 . Work Change Directive--A written <br /> Documents consisting of written technical descriptions statement to CONTRACTOR issued on or after the <br /> of materials , equipment, systems , standards , and Effective Date of the Agreement and signed by <br /> workmanship as applied to the Work and certain OWNER and recommended by ENGINEER ordering <br /> administrative details applicable thereto , an addition , deletion , or revision in the Work , or <br /> responding to differing or unforeseen subsurface or <br /> 42 . Subcontractor--An individual or entity physical conditions under which the Work is to <br />be <br /> having a direct contract with CONTRACTOR or with performed or to emergencies . A Work Change <br /> any other Subcontractor for the performance of a part Directive will not change the Contract Price <br /> or the <br /> of the Work at the Site . Contract Times but is evidence that the parties expect <br /> that the change ordered or documented by a Work <br /> 43 . Substantial Completion--The time at Change Directive will be incorporated in a subse- <br /> which the Work (or a specified part thereof) has quently issued Change Order following negotiations by <br /> progressed to the point where , in the opinion of the parties as to its effect, if any, on the Contract Price <br /> ENGINEER , the Work (or a specified part thereof) is or Contract Times . <br /> sufficiently complete , in accordance with the Contract <br /> Documents , so that the Work (or a specified part 50 . Written Amendment--A written statement <br /> thereof) can be utilized for the purposes for which it is modifying the Contract Documents , signed by <br /> intended . The terms " substantially complete” and OWNER and CONTRACTOR on or after the Effective <br /> It completed " as applied to all or part of the Date of the Agreement and normally dealing with the <br /> Work refer to Substantial Completion thereof, nonengineenng or nontechnical rather than strictly <br /> construction - related aspects of the Contract Docu - <br /> 44 . Supplementary Conditions--That part of ments . <br /> the Contract Documents which amends or <br /> supplements these General Conditions , 1 . 02 Terminology <br /> 45 . Supplier--A manufacturer, fabricator, A. Intent of Certain Terms or Adjectives <br /> supplier, distributor, materialman , or vendor having a <br /> direct contract with CONTRACTOR or with any 1 . Whenever in the Contract Documents the <br /> Subcontractor to furnish materials or equipment to be terms as allowed , " as approved , " or terms of like <br /> incorporated in the Work by CONTRACTOR or any effect or import are used , or the adjectives <br /> Subcontractor. " reasonable , " " suitable , " " acceptable , " " proper, " <br /> " satisfactory , " or adjectives of like effect or import <br /> are used to describe an action or determination of <br /> 00700 - General Conditions REV 04-07. doc <br /> 00700 - 7 <br /> F :APublic Works\ENGINEERING DIVISION PROJECTS\0845 -Dixie Hwy USI _69th (LAP) ROW Mapping Project (Morgan)AAdmin bid <br /> documents\00700 - General Conditions REV 04-07 . doc <br /> In <br /> ?' I In <br />