Laserfiche WebLink
ft <br /> TI <br /> v 1 <br /> 2 . 05 Before Starting Construction 2 . 06 Preconstruction Conference <br /> A. CONTRACTOR 's Review of Contract DocuA. Within 20 days afteF the Gnntr;; At Ti <br /> - <br /> Isis <br /> ments: Before undertaking each part of the Work , to run , but before any Work at the <br />Site i arted , a <br /> CONTRACTOR shall carefully study and compare the conference attended by CONTRACT , ENGINEER , <br /> Contract Documents and check and verify pertinent and others as appropriate willbesheld to establish <br /> a <br /> figures therein and all applicable field measurements . working URder&tand ' na ;a A the parties as to <br /> the <br /> CONTRACTOR shall promptly report in writing to Work and to disc a schedules referred to in para- <br /> ENGINEER any conflict, error, ambiguity, or graph 2 . 05 . rocedures for handling Shop Drawings <br /> discrepancy which CONTRACTOR may discover and and er submittals , processing Applications for <br /> shall obtain a written interpretation or clarification from Wnent and maintainiRg Fequired <br /> ENGINEER before proceeding with any Work affected <br /> thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity , or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI <br />- <br /> the Effective Date of the Agreement ( unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 8 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times ( numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER , <br /> of the Work , including any Milestones specified <br /> in the Contract Documents , 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 , a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal , and progress schedule , for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 . a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR ' S <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR 's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> TV serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals , <br /> and profit applicable to each item of Work . <br /> 3 . CONTRACTOR 's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work . <br /> Conditions , certificates of urance (and other <br /> evidence of insuranc Ich either of them or any <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are <br /> FeQ <br /> IT <br /> 00700 - 9 00700 - General Conditions REV 04-07. doc <br /> F :APublic Works\ENGINEERING DIVISION PROJECTS\0845 -Dixie Hwy US 169th (LAP) ROW Mapping Project (Morgan)\Admim\bid <br /> documents\00700 - General Conditions REV 04-07 . doc <br />