<br /> ARTICLE 6 - CONTRACTOR ' S RESPONSIBILITIES 6 . 03 Services, Materials, and Equipment
<br /> A . Unless otherwise specified in the General Re-
<br /> 6 . 01 Supervision and Superintendence quirements , CONTRACTOR shall provide and
<br /> assume full responsibility for all services , materials ,
<br /> A. CONTRACTOR shall supervise , inspect, and equipment, labor, transportation , construction
<br /> direct the Work competently and efficiently, devoting equipment and machinery, tools , appliances , fuel ,
<br /> such attention thereto and applying such skills and power, light, heat, telephone , water, sanitary
<br /> facilities ,
<br /> expertise as may be necessary to perform the Work in temporary facilities , and all other facilities and
<br /> accordance with the Contract Documents . CON - incidentals necessary for the performance , testing ,
<br /> TRACTOR shall be solely responsible for the means , start-up , and completion of the Work .
<br /> methods , techniques , sequences , and procedures of
<br /> construction , but CONTRACTOR shall not be B . All materials and equipment incorporated into
<br /> responsible for the negligence of OWNER or the Work shall be as specified or, if not specified , shall
<br /> ENGINEER in the design or specification of a specific be of good quality and new, except as otherwise
<br /> tin means , method , technique , sequence , or procedure of provided in the Contract Documents . All warranties
<br /> construction which is shown or indicated in and and guarantees specifically called for by the Specifica-
<br /> expressly required by the Contract Documents . CON - tions shall expressly run to the benefit of OWNER . If
<br /> TRACTOR shall be responsible to see that the required by ENGINEER , CONTRACTOR shall furnish
<br /> completed Work complies accurately with the Contract satisfactory evidence ( including reports of required
<br /> Documents . tests) as to the source , kind , and quality of materials
<br /> and equipment. All materials and equipment shall be
<br /> B . At all times during the progress of the Work , stored , applied , installed , connected , erected ,
<br /> CONTRACTOR shall assign a competent resident protected , used , cleaned , and conditioned in
<br /> superintendent thereto who shall not be replaced accordance with instructions of the applicable
<br /> without written notice to OWNER and ENGINEER Supplier, except as otherwise may be provided in the
<br /> except under extraordinary circumstances . The Contract Documents .
<br /> superintendent will be CONTRACTOR's
<br /> In representative at the Site and shall have authority to 6 . 04 Progress Schedule
<br /> act on behalf of CONTRACTOR . All communications
<br /> given to or received from the superintendent shall be A. CONTRACTOR shall adhere to the progress
<br /> binding on CONTRACTOR . schedule established in accordance with paragraph
<br /> 2 . 07 as it may be adjusted from time to time as
<br /> 6 . 02 Laborm Working Hours provided below.
<br /> A. CONTRACTOR shall provide competent, 1 . CONTRACTOR shall submit to
<br /> suitably qualified personnel to survey, lay out, and ENGINEER for acceptance (to the extent ii i-
<br /> construct the Work as required by the Contract Docu - cated in paragraph 2 . 07) proposed adjustments
<br /> ments . CONTRACTOR shall at all times maintain in the progress schedule that will not result
<br /> in
<br /> good discipline and order at the Site , changing the Contract Times (or Milestones) .
<br /> Such adjustments will conform generally to the
<br /> B . Except as otherwise required for the safety or progress schedule then in effect and additional -
<br /> protection of persons or the Work or property at the ly will comply with any provisions of the General
<br /> Site or adjacent thereto , and except as otherwise Requirements applicable thereto .
<br /> stated in the Contract Documents , all Work at the Site
<br /> shall be performed during regular working hours , and 2 . Proposed adjustments in the
<br /> CONTRACTOR will not permit overtime work or the progress schedule that will change the Contract
<br /> performance of Work on Saturday, Sunday, or any Times (or Milestones) shall be submitted in
<br /> legal holiday without OWNER 's written consent (which accordance with the requirements of Article 12 ,
<br /> will not be unreasonably withheld ) given after prior Such adjustments may only be made by a
<br /> written notice to ENGINEER . Change Order or Written Amendment in accor-
<br /> dance with Article 12 ,
<br /> 6 . 05 Substitutes and "Or-Equals "
<br /> 00700 - General Conditions REV 04-07. doo
<br /> 00700 - 19
<br /> F:APublic Works\ENGINEERING DIVISION PROJECTS\0845 -Dixie Hwy US1 _69th (LAP) ROW Mapping Project (Morgan)AAdmim\bid
<br /> documents\00700 - General Conditions REV 04-07 . doc