<br /> employees , agents , and other consultants and comparable provisions for the benefit of
<br /> subcontractors of each and any of them arising out of: CONTRACTOR in said direct contracts between
<br /> OWNER and such utility owners and other
<br /> 1 . the preparation or approval of, or the contractors .
<br /> failure to prepare or approve , maps , Drawings ,
<br /> opinions , reports , surveys , Change Orders , C . If the proper execution or results of any part of
<br /> designs , or Specifications ; or CONTRACTOR 's Work depends upon work per.
<br /> formed by others under this Article 7 , CONTRACTOR
<br /> 2 , giving directions or instructions , or shall inspect such other work and promptly report to
<br /> failing to give them , if that is the primary cause ENGINEER in writing any delays , defects , or deficien
<br />-
<br /> of the injury or damage . cies in such other work that render it unavailable or
<br /> unsuitable for the proper execution and results of
<br /> CONTRACTOR's Work . CONTRACTOR ' s failure to
<br /> ARTICLE 7 - OTHER WORK so report will constitute an acceptance of such other
<br /> work as fit and proper for integration with
<br /> CONTRACTOR's Work except for latent defects and
<br /> 7 . 01 Related Work at Site deficiencies in such other work .
<br /> A. OWNER may perform other work related to 7 . 02 Coordination
<br /> the Project at the Site by OWNER 's employees , or let
<br /> other direct contracts therefor, or have other work A. If OWNER intends to contract with others
<br /> for
<br /> performed by utility owners . If such other work is not the performance of other work on the Project
<br /> at the
<br /> noted in the Contract Documents , then : Site , the following will be set forth in Supplementary
<br /> Conditions :
<br /> 1 . written notice thereof will be given to
<br /> CONTRACTOR prior to starting any such other 1 . the individual or entity who will have
<br /> work , and authority and responsibility for coordination of
<br /> the activities among the various contractors will
<br /> IF 2 . if OWNER and CONTRACTOR are be identified ;
<br /> unable to agree on entitlement to or on the
<br /> amount or extent, if any, of any adjustment in 2 , the specific matters to be covered by
<br /> the Contract Price or Contract Times that such authority and responsibility will be
<br /> should be allowed as a result of such other itemized ; and
<br /> work , a Claim may be made therefor as
<br /> IF provided in paragraph 10 . 05 . 31 the extent of such authority and
<br /> responsibilities will be provided .
<br /> B . CONTRACTOR shall afford each other
<br /> contractor who is a party to such a direct contract and B . Unless otherwise provided in the
<br /> each utility owner (and OWNER , if OWNER is per. Supplementary Conditions , OWNER shall have sole
<br /> forming the other work with OWNER ' s employees) authority and responsibility for such coordination ,
<br /> proper and safe access to the Site and a reasonable
<br /> opportunity for the introduction and storage of
<br /> materials and equipment and the execution of such ARTICLE 8 - OWNER ' S RESPONSIBILITIES
<br /> other work and shall properly coordinate the Work with
<br /> theirs . Unless otherwise provided in the Contract
<br /> Documents , CONTRACTOR shall do all cutting , 8 . 01 Communications to Contractor
<br /> fitting , and patching of the Work that may be required
<br /> to properly connect or otherwise make its several A. Except as otherwise provided in these
<br /> parts come together and properly integrate with such General Conditions , OWNER shall issue all communi-
<br /> other work. CONTRACTOR shall not endanger any cations to CONTRACTOR through ENGINEER ,
<br /> work of others by cutting , excavating , or otherwise
<br /> altering their work and will only cut or alter their work 8 . 02 Replacement of ENGINEER
<br /> with the written consent of ENGINEER and the others
<br /> whose work will be affected . The duties and A. In case of termination of the employment of
<br /> responsibilities of CONTRACTOR under this ENGINEER , OWNER shall appoint an engineer to
<br /> paragraph are for the benefit of such utility owners and whom CONTRACTOR makes no reasonable
<br /> other contractors to the extent that there are
<br /> 00700 - General Conditions REV 04-07, doc
<br /> 00700 - 27
<br /> F:APublic Works\ENGINEERING DIVISION PROJECTS\0845 -Dixie Hwy USI_69th (LAP) ROW Mapping Project (Morgan)AAdmim\bid
<br /> documents\00700 - General Conditions REV 04-07 . doc
<br />
|