My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-226B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-226B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 2:14:52 PM
Creation date
10/1/2015 3:10:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/01/2011
Control Number
2011-226B
Agenda Item Number
8.N.
Entity Name
Goodson Paving Old Dixie Highway Sidewalk
Subject
Old Dixie Highway Sidewalk Improvements
Volume I
Project Number
0845
Bid Number
2011045
Supplemental fields
SmeadsoftID
10417
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. rev' 4 ��' ,�.,rX��. t �"' �-� �h. sit �"�" e a •^� y 3 , t �� c '�,�'� <br /> , " k.„, <br /> SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> Be TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1 . 4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but <br /> the CONTRACTOR shall provide inspection of work area daily and shall take <br /> whatever measures are necessary to protect the safety of the public , workmen , <br /> and materials , and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work <br /> of this Contract . In dry weather, spray dusty areas daily with water in order to <br /> control dust . Take necessary steps to prevent the tracking of mud onto adjacent <br /> streets and highways . <br /> 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally <br /> dispose of them as soon as the work is complete . The areas of the site used for <br /> temporary facilities shall be properly reconditioned and restored to a condition <br /> acceptable to the OWNER . <br /> + + END OF SECTION + + <br /> 01520-2 <br /> F : \Public Works\ ENGINEERING DIVISION PROJECTS\0845 - Dixie Hwy Sidewalk US1 _69th <br /> ( LAP )Wdmim \bid documents\01520 - Construction Facilities . doc <br /> �k fit s ^' 77 7 <br /> ,' ''fi •4 '3Y ' r} h x <br /> „ > ._ <br />
The URL can be used to link to this page
Your browser does not support the video tag.