Laserfiche WebLink
CLARIFICATIONS / CORRECTIONS : <br /> 1 . MATERIALS TESTING REQUIREMENTS : <br /> Although the project is on an off state system , there is a structure on the project , which requires <br /> oversight in accordance with 23 . 1 . 2 of the LAP Manual . Materials testing must be in accordance with <br /> the FDOT Road and Bridge Specification and the FDOT Sampling Testing and Reporting Guide . The <br /> contract also requires the use of LIMS , which is the FDOT Laboratory Information Management <br /> System ( a database system for recording materials testing ) . <br /> Basically the contractors and the County will be required to perform testing as if it were an FDOT <br /> project . This means the Contractor will have to perform QC testing and the County will have to <br /> perform Verification Testing at the frequencies required in the Specifications . The test results will have <br /> to be recorded in the LIMS system . QC results are entered in LIMS by the Contractor and VT results <br /> are entered by the County . <br /> Therefore , the Contractor will need to perform QC testing and provide the results in LIMS . <br /> 2 . QUESTION : Reference Sheet #3 Pay Item Foot Notes call out Item #' s 430- 174 - 101 & 430- 174 -201 . <br /> No such Item No . ' s exist in the Summary of Pay Items . Please clarify which of the 3 drainage pipe <br /> items should include the collars and friable base . <br /> ANSWER : Pay items 430- 174- 101 & 430- 174-201 are incorrect item numbers . The Foot Note ( cost <br /> to include but not limited to concrete collars and friable base) apply to the pipe culvert pay items <br /> 430- 174- 118 , 430- 174-215 , and 430- 174-218 . <br /> 3 . The most recent Official USDOL Wage Decision last updated 4/8/ 11 for FL317 is included in this <br /> addendum . This Wage Decision shall apply if within 10 days prior to the bid opening . <br /> ATTACHMENTS : <br /> 1 . Pre Bid Meeting Minutes <br /> 2 . Official USDOL Wage Decision last updated 4/8/ 11 for FL317 <br /> ****** * * * **** This Addendum MUST be returned with your Bid ************** <br /> ADDENDUM NO . 1 is submitted by : <br /> 0000 Michael D . Nixon , P . E . , Roadway Production Manager <br /> anqJ <br /> J &rfy Dav s , Purchasing Manager <br /> Company Name Goo son PAJth ts3c <br /> Name : — �t� , �_ Title . q ►Ci&� Qzz& titalzr <br /> ( Type / Printed ) <br /> Authorized Signature : Date . 512 t IL I <br /> Telephone : 321 - (a31 - 5523 Fax . 32L(o3' -QLA 2 <br /> Page 2 of 2 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0845 -Old Dixie Hairy Sidewalk US1_69th (LAP)\.Admim\bid documents\Addendmns\Addendum <br /> # l . doc <br />