My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-061
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:50:43 PM
Creation date
10/1/2015 2:04:36 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/02/2010
Control Number
2010-061
Agenda Item Number
12.J.5.
Entity Name
Gopher Tortoise Relocation
Subject
Masteller & Moler
Project Number
Amendment No. 4 to Work Order No. 4
Supplemental fields
SmeadsoftID
9599
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b <br /> w <br /> Our File #0627 <br /> February 18 , 2010 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT #4 TO <br /> " EXHIBIT 1 " <br /> Work Authorization #4 , which was approved by the Board of County Commissioners on July 11 , <br /> 2006 , included Engineering Services in connection with conversion of an existing 8" force main <br /> to an 8" reuse pipeline . Amendment # 1 was approved to authorize Engineering Services for the <br /> removal of the existing 8" force main and its replacement with a 16" reuse main in accordance <br /> with the Reuse Master Plan . Amendment #2 was approved to authorize modifications to the <br /> proposed route of the 16" reuse main to satisfy Indian River Farms Water Control District . <br /> Amendment #3 was approved to include tasks for additional professional services necessary to <br /> survey endangered species and obtain related permits , and additional design and inspection <br /> services related to additional utilities work. <br /> Construction has commenced on the proposed 16° reuse water main along Lateral G Canal . <br /> However, in the course of construction the presence of listed wildlife species were discovered , <br /> specifically the gopher tortoise and Florida Scrub Jay. A " Notice to Suspend Work" was issued <br /> by the Utilities Department on or about September 17 , 2009 . Since then Scrub Jay and Gopher <br /> Tortoise relocation permits have been obtained . The project is ready to re-commence upon <br /> completion of the temporary relocation of gopher tortoises . <br /> This Amendment #4 is presented to include tasks for additional professional services necessary <br /> to temporarily relocate gopher tortoises . A brief description of the scope of services and <br /> deliverables for Work Authorization #4 is provided below: <br /> Scope of Services <br /> Task E — Gopher Tortoise Relocation <br /> Using an FWCC Authorized Agent experienced in tortoise removal and relocation , we will <br /> provide the on-site relocation of the Florida gopher tortoises anticipated to inhabit the <br /> construction area based on the tortoise survey completed under Addendum #3 . The Agent will <br /> supervise the excavation of the burrows and the relocation of gopher tortoises and commensal <br /> species . <br /> Upon completion of the relocation the Agent will prepare and submit to FFWCC all required <br /> data . <br /> It is understood that the Utilities Department will provide for the installation of silt fence <br />to <br /> prevent relocated tortoises from re-entering the construction area , and will provide a backhoe <br /> and operator to perform the excavation . These items are therefore not included in this task . <br /> Y:\mm\Projects\2006\0627\ADMIN\Contracts\AMENDMENT #410627 Exhibit 1 Amen#4 10-0218. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.