My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-294
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 11:04:52 AM
Creation date
10/1/2015 2:35:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/16/2010
Control Number
2010-294
Agenda Item Number
8.R.
Entity Name
Graves Brothers Company
Subject
Installation and Construction of Drainage Ditch and Pipes
Area
CR 510 and Old Dixie Highway
Supplemental fields
SmeadsoftID
9886
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 - 160 <br /> AGREEMENT BETWEEN <br /> INDIAN RIVER COUNTY, FLORIDA <br /> AND <br /> GRAVES BROTHERS COMPANY <br /> FOR INSTALLATION AND CONSTRUCTION OF A DRAINAGE DITCH AND PIPES <br /> NEAR COUNTY ROAD 510 AND OLD DIXIE HIGHWAY <br /> THIS AGREEMENT , entered into this 16th day of November , 2010 , by and <br /> between Indian River County , Florida a political subdivision of the State of Florida , 1801 <br /> 27th Street , Vero Beach , Florida 32960 , hereafter referred to as " County " and Graves <br /> Brothers Company , 2770 Indian River Boulevard , Suite 201 , Vero Beach , Florida <br /> 32960 , hereafter referred to as " GBC " . <br /> WITNESSETH <br /> WHEREAS , GBC has agreed to design , and the County has agreed to construct , <br /> a drainage ditch and drain pipes within GBC property and County-owned right- of-way <br /> along County Road 510 ( " CR510 " ) and Old Dixie Highway ( " Old Dixie Hwy ") in Indian <br /> River County , hereinafter referred to as the " Project" ; and <br /> WHEREAS , the Project will serve to drain stormwater runoff from GBC property , <br /> County- owned CR510 right- of-way and other third party properties as indicated on the <br /> sketch attached hereto as Exhibit "A" (the " Drainage Area " ) ; and <br /> WHEREAS , the County has agreed to build the Project over real property owned <br /> by the County and GBC ; and <br /> WHEREAS , GBC has designed the Project per the plans shown on Exhibit " B " <br /> (the " Plans " ) , to the specification of the County ; and <br /> WHEREAS , GBC has agreed to grant to the County a temporary construction <br /> easement over the portion of the Project to be constructed by the County as described <br /> on Exhibit " C " attached hereto for the temporary use by the County to construct the <br /> Project ; and <br /> WHEREAS , the County has agreed to provide sufficient in - house labor , materials <br /> and equipment to complete the Project in its entirety ; and <br /> WHEREAS , once construction is completed , the County and GBC have agreed <br /> to share maintenance with each entity maintaining that portion of the Project which falls <br /> within their respective property boundaries , including all mowing and ditch maintenance , <br /> with pipe and drainage structure maintenance to be done by the County ; and <br /> WHEREAS , both the County and GBC can mutually benefit through a joint effort <br /> that will transfer responsibility of constructing the Project from GBC to the County ; <br /> / _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.