Laserfiche WebLink
Comprehensive Plan Potable Water Sub-Element <br /> are not limited to the Federal Safe Drinking Water Act, Public Law 93-523 ; the Florida Safe <br /> Drinking Water Act, Section 403 . 850 - 403 . 864, FS ; Chapter 381 , FS ; and Rules 62-550, <br /> 40C-2, 40C-3 , 17-22, .and 64E- 8 , FAC . Both state and county permits are required for the <br /> construction of a plant, and for any future expansion or modification - of a plant. <br /> POLICY 6.6: At the time the county approves privately owned public water treatment plants, <br /> the county will require that, at the time deemed appropriate by the county, the water <br /> treatment plant shall be dedicated to the county for operation and maintenance. <br /> POLICY .6.7 : The county shall require all future connections to the regional potable water <br /> system to be consistent with the attached water and wastewater connection matrix. <br /> Page 2 of 2 <br />