Laserfiche WebLink
proposed by CONTRACTOR is functionally <br /> B . All materials and equipment incorporated into equal to that named and sufficiently similar so <br /> the Work shall be as specified or, if not specified , shall that no change in related Work will be <br /> required , <br /> be of good quality and new, except as otherwise it may be considered by ENGINEER as an <br /> provided in the Contract Documents . All warranties "or-equal " item , in which case review and <br /> and guarantees specifically called for by the Specifica- approval of the proposed item may, in <br /> tions shall expressly run to the benefit of OWNER . If ENGINEER's sole discretion , be accomplished <br /> required by ENGINEER , CONTRACTOR shall furnish without compliance with some or all of the <br /> satisfactory evidence ( including reports of required requirements for approval of proposed substi- <br /> tests ) as to the source , kind , and quality of materials tute items . For the purposes of this <br /> paragraph <br /> and equipment. All materials and equipment shall be 6 . 05 .A. 1 , a proposed item of material or <br /> stored , applied , installed , connected , erected , equipment will be considered functionally equal <br /> protected , used , cleaned , and conditioned in to an item so named if: <br /> accordance with instructions of the applicable <br /> Supplier, except as otherwise may be provided in the a . in the exercise of reasonable <br /> Contract Documents . judgment ENGINEER determines that : i it <br /> is at least equal in quality, durability, <br /> 6 . 04 Progress Schedule appearance , strength , and design <br /> characteristics ; ( ii ) it will reliably perform at <br /> A. CONTRACTOR shall adhere to the progress least equally well the function imposed by <br /> schedule established in accordance with paragraph the design concept of the completed Project <br /> 2 . 07 as it may be adjusted from time to time as as a functioning whole , and ; <br /> provided below. <br /> b . CONTRACTOR certifies that : ( i ) <br /> 1 . CONTRACTOR shall submit to there is no increase in cost to the OWNER; <br /> ENGINEER for acceptance (to the extent in & and ( ii ) it will conform substantially, even <br /> cated in paragraph 2 . 07 ) proposed adjustments with deviations , to the detailed requirements <br /> in the progress schedule that will not result in of the item named in the Contract <br /> changing the Contract Times (or Milestones ) . Documents . <br /> Such adjustments will conform generally to the <br /> progress schedule then in effect and additional - 2 . Substitute Items <br /> ly will comply with any provisions of the General <br /> Requirements applicable thereto . a . If in ENGINEER's sole discretion an <br /> item of material or equipment proposed by <br /> 2 . Proposed adjustments in the CONTRACTOR does not qualify as an <br /> progress schedule that will change the Contract "or-equal" item under paragraph 6 . 05 .A. 11 it <br /> Times (or Milestones ) shall be submitted in will be considered a proposed substitute <br /> accordance with the requirements of Article 12 . item . <br /> Such adjustments may only be made by a <br /> Change Order or Written Amendment in accor- b . CONTRACTOR shall submit suffi- <br /> dance with Article 12 , cient information as provided below to allow <br /> ENGINEER to determine that the item of <br /> 6 . 05 Substitutes and "Or-Equals " material or equipment proposed is <br /> essentially equivalent to that named and an <br /> A . Whenever an item of material or equipment is acceptable substitute therefor. Requests for <br /> specified or described in the Contract Documents by review of proposed substitute items of <br /> using the name of a proprietary item or the name of a material or equipment will not be accepted <br /> particular Supplier, the specification or description is by ENGINEER from anyone other than <br /> intended to establish the type , function , appearance , CONTRACTOR , <br /> and quality required . Unless the specification or <br /> description contains or is followed by words reading c . The procedure for review by ENGI - <br /> that no like , equivalent , or "or-equal" item or no NEER will be as set forth in paragraph <br /> substitution is permitted , other items of material or 6 . 05 .A . 2 . d , as supplemented in the General <br /> equipment or material or equipment of other Suppliers Requirements and as ENGINEER may <br /> may be submitted to ENGINEER for review under the decide is appropriate under the <br /> circumstances described below . circumstances . <br /> 1 . "Or-Equal" Items: If in ENGINEER 's d . CONTRACTOR shall first make <br /> sole discretion an item of material or equipment written application to ENGINEER for review <br /> 00700 - General Conditions REV 04-07 .doc <br /> 00700 - 19 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\98106-66th Ave Ph 2 4th Sl to 16th St\Admim\bid documents\00700 - General Conditions REV 04-07 <br />.doc <br />