My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-056A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:00:06 PM
Creation date
10/1/2015 4:19:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2012
Control Number
2012-056A
Agenda Item Number
8.K.
Entity Name
Guettler Brothers
Subject
66th Avenue Roadway Improvements Phase 2
Area
4th Street to 16th St.
Project Number
9810-B
Bid Number
2012032
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11108
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to show ENGINEER the services , materials , and CONTRACTOR's review and approval of that <br /> equipment CONTRACTOR proposes to provide and submittal , <br /> to enable ENGINEER to review the information for the <br /> limited purposes required by paragraph 6 . 17 . E . 3 . At the time of each submittal , CON . <br /> Samples to TRACTOR shall give ENGINEER specific <br /> B . CONTRACTOR shall also submit Sam <br /> p written notice of such variations , if any, that the <br /> ENGINEER for review and approval in accordance Shop Drawing or Sample submitted may have <br /> with the acceptable schedule of Shop Drawings and from the requirements of the Contract <br /> Sample submittals . Each Sample will be identified Documents , such notice to be in a written <br /> com - <br /> clearly as to material , Supplier, pertinent data such as munication separate from the submittal ; and , <br /> in <br /> catalog numbers , and the use for which intended and addition , shall cause a specific notation <br /> to be <br /> otherwise as ENGINEER may require to enable ENGI - made on each Shop Drawing and Sample sub- <br /> NEER to review the submittal for the limited purposes mitted to ENGINEER for review and approval of <br /> required by paragraph 6 . 17 . E . The numbers of each each such variation . <br /> Sample to be submitted will be as specified in the <br /> Specifications . E . ENGINEER 's Review <br /> C . Where a Shop Drawing or Sample is required 1 . ENGINEER will timely review and <br /> by the Contract Documents or the schedule of Shop approve Shop Drawings and Samples in <br /> Drawings and Sample submittals acceptable to ENGI - accordance with the schedule of Shop <br /> NEER as required by paragraph 2 . 07 , any related Drawings and Sample submittals acceptable to <br /> Work performed prior to ENGINEER's review and ENGINEER . ENGINEER's review and <br /> approval of the pertinent submittal will be at the sole <br /> approval will be only to determine if the items <br /> expense and responsibility of CONTRACTOR . covered by the submittals will , after installation <br /> or incorporation in the Work , conform to the <br /> D . Submittal Procedures information given in the Contract Documents <br /> and be compatible with the design concept of <br /> 1 . Before submitting each Shop the completed Project as a functioning whole as <br /> Drawing or Sample , CONTRACTOR shall have indicated by the Contract Documents , <br /> determined and verified : <br /> 2 . ENGINEER's review and approval <br /> a , all field measurements , quantities , will not extend to means , methods , techniques , <br /> dimensions , specified performance criteria , sequences , or procedures of construction <br /> installation requirements , materials , catalog (except where a particular means , method , <br /> numbers , and similar information with technique , sequence , or procedure of con - <br /> respect thereto ; struction is specifically and expressly called for <br /> by the Contract Documents ) or to safety <br /> b , all materials with respect to intended precautions or programs incident thereto . The <br /> use , fabrication , shipping , handling , storage , review and approval of a separate item as such <br /> assembly, and installation pertaining to the will not indicate approval of the assembly <br /> in <br /> performance of the Work ; which the item functions . <br /> c . all information relative to means , 3 . ENGINEER's review and approval of <br /> methods , techniques , sequences , and Shop Drawings or Samples shall not relieve <br /> procedures of construction and safety CONTRACTOR from responsibility for any <br /> precautions and programs incident thereto ; variation from the requirements of the Contract <br /> and Documents unless CONTRACTOR has in <br /> writing called ENGINEER's attention to each <br /> d . CONTRACTOR shall also have such variation at the time of each submittal as <br /> reviewed and coordinated each Shop required by paragraph 6 . 17 . D . 3 and ENGI . <br /> Drawing or Sample with other Shop NEER hasiven written approval pproval of each such <br /> Drawings and Samples and with the <br /> variation by specific written notation thereof <br /> requirements of the Work and the Contract incorporated in or accompanying the Shop <br /> Documents , DrawingSample or p approval ; nor will any <br /> 2 . Each submittal shall bear a stampapproval by ENGINEER relieve CON . <br /> or TRACTOR from responsibility for complying <br /> specific written indication that CONTRACTOR <br /> with the requirements of paragraph 6 . 17 . D . 1 . <br /> has satisfied CONTRACTOR's obligations <br /> under the Contract Documents with respect to <br /> 0 - 24 00700 - General Conditions REV 04-07 .doc <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\981013-66th Ave Ph 2 4th St to 16tth7SOt\Adm m\bid documents\00700 - General Conditions REV 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.