My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-056A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:00:06 PM
Creation date
10/1/2015 4:19:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2012
Control Number
2012-056A
Agenda Item Number
8.K.
Entity Name
Guettler Brothers
Subject
66th Avenue Roadway Improvements Phase 2
Area
4th Street to 16th St.
Project Number
9810-B
Bid Number
2012032
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11108
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perform any of the Work , or anyone for whose acts Documents , CONTRACTOR shall do all cutting , <br /> any of them may be liable , the indemnification fitting , and patching of the Work that may be required <br /> obligation under paragraph 6 . 20 .A shall not be limited to properly connect or otherwise make its several <br /> in any way by any limitation on the amount or type of parts come together and properly integrate with <br /> such <br /> damages , compensation , or benefits payable by or for other work . CONTRACTOR shall not endanger any <br /> CONTRACTOR or any such Subcontractor, Supplier, work of others by cutting , excavating , or otherwise <br /> or other individual or entity under workers ' compen - altering their work and will only cut or alter <br /> their work <br /> sation acts , disability benefit acts , or other employee with the written consent of ENGINEER and the <br /> others <br /> benefit acts . whose work will be affected . The duties and <br /> responsibilities of CONTRACTOR under this <br /> C . The indemnification obligations of CON - paragraph are for the benefit of such utility owners and <br /> TRACTOR under paragraph 6 . 20 .A shall not extend to other contractors to the extent that there are <br /> the liability of ENGINEER and ENGINEER's comparable provisions for the benefit of <br /> Consultants or to the officers , directors , partners , CONTRACTOR in said direct contracts between <br /> employees , agents , and other consultants and OWNER and such utility owners and other <br /> subcontractors of each and any of them arising out of: contractors . <br /> 1 . the preparation or approval of, or the C . If the proper execution or results of any part of <br /> failure to prepare or approve , maps , Drawings , CONTRACTOR's Work depends upon work per- <br /> opinions , reports , surveys , Change Orders , formed by others under this Article 7 , CONTRACTOR <br /> designs , or Specifications ; or shall inspect such other work and promptly report to <br /> ENGINEER in writing any delays , defects , or deficien - <br /> 2 . giving directions or instructions , or cies in such other work that render it unavailable or <br /> failing to give them , if that is the primary cause unsuitable for the proper execution and results of <br /> of the injury or damage . CONTRACTOR's Work . CONTRACTOR's failure to <br /> so report will constitute an acceptance of such other <br /> work as fit and proper for integration with <br /> ARTICLE 7 - OTHER WORK CONTRACTOR's Work except for latent defects and <br /> deficiencies in such other work . <br /> 7 . 01 Related Work at Site 7 . 02 Coordination <br /> A. OWNER may perform other work related to A. If OWNER intends to contract with others for <br /> the Project at the Site by OWNER's employees , or let the performance of other work on the Project <br /> at the <br /> other direct contracts therefor, or have other work Site , the following will be set forth in <br /> Supplementary <br /> performed by utility owners . If such other work is not Conditions : <br /> noted in the Contract Documents , then : <br /> 1 . given to 1 , the individual or entity who will have <br /> written notice thereof will be <br /> 9 authority and responsibility for coordination of <br /> CONTRACTOR prior to starting any such other the activities among the various contractors will <br /> work ; and be identified ; <br /> 2 . if OWNER and CONTRACTOR are 2 , the specific matters to be covered by <br /> unable to agree on entitlement to or on the such authority and responsibility will <br /> be <br /> amount or extent , if any, of any adjustment in itemized ; and <br /> the Contract Price or Contract Times that <br /> should be allowed as a result of such other 3 , the extent of such authority and <br /> work , a Claim may be made therefor as responsibilities will be provided , <br /> provided in paragraph 10 . 05 . <br /> B . Unless otherwise provided in the <br /> B . CONTRACTOR shall afford each other Supplementary Conditions , OWNER shall have sole <br /> contractor who is a party to such a direct contract and authority and responsibility for such coordination . <br /> each utility owner (and OWNER , if OWNER is per- <br /> forming the other work with OWNER's employees ) <br /> proper and safe access to the Site and a reasonable <br /> opportunity for the introduction and storage of <br /> materials and equipment and the execution of such <br /> other work and shall properly coordinate the Work with <br /> theirs . Unless otherwise provided in the Contract <br /> 00700 - General Conditions REV 04-07 . doc <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\9810B-66th Ave Ph 2 4th St to 16tth7SOt\Admlm\bid documents\00700 - General Conditions REV 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.