My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-056A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:00:06 PM
Creation date
10/1/2015 4:19:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2012
Control Number
2012-056A
Agenda Item Number
8.K.
Entity Name
Guettler Brothers
Subject
66th Avenue Roadway Improvements Phase 2
Area
4th Street to 16th St.
Project Number
9810-B
Bid Number
2012032
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11108
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER's efforts will be directed toward providing Documents which do not involve an adjustment in the <br /> for OWNER a greater degree of confidence that the Contract Price or the Contract Times and are compati- <br /> completed Work will conform generally to the Contract ble with the design concept of the completed Project <br /> Documents . On the basis of such visits and as a functioning whole as indicated by the Contract <br /> observations , ENGINEER will keep OWNER informed Documents . These may be accomplished by a Field <br /> of the progress of the Work and will endeavor to guard Order and will be binding on OWNER and <br /> also on <br /> OWNER against defective Work . CONTRACTOR, who shall perform the Work involved <br /> promptly. If OWNER and CONTRACTOR are unable <br /> B . ENGINEER 's visits and observations are to agree on entitlement to or on the amount or extent , <br /> subject to all the limitations on ENGINEER 's authority if any, of any adjustment in the Contract Price <br /> or <br /> and responsibility set forth in paragraph 9 . 10 , and Contract Times , or both , as a result of a Field <br />Order, <br /> particularly, but without limitation , during or as a result a Claim may be made therefor as provided in <br /> of ENGINEER's visits or observations of paragraph 10 . 05 . <br /> CONTRACTOR's Work ENGINEER will not <br /> supervise , direct, control , or have authority over or be 9 . 06 Rejecting Defective Work <br /> responsible for CONTRACTOR's means , methods , <br /> techniques , sequences , or procedures of construction , <br /> A .or the safety precautions and programs incident or reject Wortk wRhich I ENGINEER authority have believes <br />dptorobe <br /> thereto , or for any failure of CONTRACTOR to comply defective , or that ENGINEER believes will not produce <br /> with Laws and Regulations applicable to the a completed Project that conforms to the Contract <br /> performance of the Work . Documents or that will prejudice the integrity of the <br /> 9 . 03 Project Representative design concept of the completed Project as a <br /> functioning whole as indicated by the Contract <br /> Documents . ENGINEER will also have authority to <br /> A. If OWNER and ENGINEER agree , ENGI - require special inspection or testing of the Work as <br /> NEER will furnish a Resident Project Representative provided in paragraph 13 . 04 , whether or not the <br /> Work <br /> to assist ENGINEER in providing more extensive is fabricated , installed , or completed , <br /> observation of the Work . The responsibilities and <br /> authority and limitations thereon of any such Resident 9 . 07 Shop Drawings, Change Orders and <br /> Project Representative and assistants will be as Payments <br /> provided in paragraph 9 . 10 and in the Supplementary <br /> Conditions . If OWNER designates another represen - A . In connection with ENGINEER's authority as <br /> tative or agent to represent OWNER at the Site who is <br /> not ENGINEER's Consultant , agent or employee , the to Shop Drawings and Samples , see paragraph 6 . 17 . <br /> responsibilities and authority and limitations thereon of <br /> B . In connetion with such other individual or entity will be as provided in the to <br /> Change Orde sc see Articles ONEE and 12hority as <br /> Supplementary Conditions . <br /> C . In connection with ENGINEER's authority as <br /> 9 . 04 Clarifications and Interpretations <br /> to Applications for Payment, see Article 14 , <br /> A. ENGINEER will issue with reasonable <br /> promptness such written clarifications or interpreta- <br /> tions of the requirements of the Contract Documents <br /> as ENGINEER may determine necessary, which shall A. ENGINEER will determine the actual quanti- <br /> ties and classifications of Unit Price Work performed <br /> be consistent with the intent of and reasonably by CONTRACTOR . ENGINEER will review with <br /> inferable from the Contract Documents . Such written <br /> CONTRACTOR the ENGINEER's preliminary <br /> clarifications and interpretations will be bindingon <br /> determinations on such matters before rendering a <br /> OWNER and CONTRACTOR . If OWNER and CON - <br /> written decision thereon (by recommendation of an <br /> TRACTOR are unable to agree on entitlement to or on Application for Payment or otherwise) . ENGINEER's <br /> the amount or extent , if any, of any adjustment in the <br /> written decision thereon will be final and binding <br /> Contract Price or Contract Times , or both , that should <br /> clarification or (except as modified by ENGINEER to reflect changed <br /> be allowed as a result of a written <br /> factual conditions or more accurate data ) upon <br /> interpretation , a Claim may be made therefor as OWNER and CONTRACTOR , <br /> provided in paragraph 10 . 05 , provisions of paragraph 10 . 05 , subject to the <br /> 9 . 05 Authorized Variations in Work 9 . 09 Decisions on Requirements of Contract <br /> A. ENGINEER may authorize minor variations in Documents and Acceptability of Work <br /> the Work from the requirements of the Contract <br /> 0 - 28 00700 - General Conditions REV 04-07 .doc <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\981013-66th Ave Ph 2 4th St to 16tth7SOtMnnir\bid documents\00700 - General Conditions REV 04-07 <br />. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.