Laserfiche WebLink
23 ) Line Item 102-99, ( CHANGEABLE VARIABLE MESSAGE SIGN ) , QUANTITY 360 PD shall be amended to <br /> read ( CHANGEABLE VARIABLE MESSAGE SIGN ) , QUANTITY 420 PD1 . <br /> a ) Additional time was added to provide 6 Changeable Variable Message signs set up for 10 days <br /> prior to construction informing motorist of the upcoming road work . <br /> 24 ) QUESTION : Will the County require laser profiling and video taping of the new drainage system ? <br /> ANSWER : The contract does not require laser profiling or video taping of the new drainage system . <br /> 25 ) QUESTION : After reviewing the plans and Itemized Bid Schedule there does not appear to be any line <br /> item for the removal and replacement of existing livestock fence with the installation of the <br /> temporary livestock fence , remove and replace existing fence outside of the ROW or removal of <br /> existing fence . <br /> ANSWER : These line items will be addressed by the addition of the following new line items on the <br /> Itemized Bid Schedule : <br /> 1 . Line Item 55040400 REMOVE EXISTING FENCE (AS SHOWN ON THE PLANS) per LUMP <br /> SUM <br /> 2 . Line Item 55040401 REMOVE AND REPLACE EXISTING FENCE OUTSIDE RIGHT-OF -WAY <br /> (AS SHOWN ON THE PLANS ) per LUMP SUM <br /> 3 . Line Item 550- 10402 INSTALL TEMPORARY FENCING (AS SHOWN ON THE PLANS ) per <br /> LUMP SUM <br /> ATTACHMENTS . <br /> 1 . Pre -bid Meeting Minutes, February 15, 2012 <br /> 2 . REVISED Itemized Bid Schedule ( Labeled Addendum No . 2 ) <br /> 3 . Sheet 39 of the plans ( missing from some of the bid sets sold ) ( dated February 24, 2012 ) <br /> 4 . REVISED Plan sheets 10, 11, 12, 13, 14A, 22, 23 , 25, 29, 42,46, 57, 58, 61 , 62, 112, 119, 158 ( dated February <br /> 24, 2012 ) <br /> 5 . REVISED UTILITY PLANS WG1, WG6, WC- 7 , WC-8 ( dated February 24, 2012 ) <br /> 6 . REVISED BRIDGE PLANS B1, 621 B3 , B9, B11 ( dated February 24, 2012 ) <br /> 7 . Latest Army Corp of Engineers Permit <br /> Page 4 of 5 <br />