Laserfiche WebLink
17 . Drawings--That part of the Contract completion date or time prior to Substantial Comple- <br /> Documents prepared or approved by ENGINEER tion of all the Work . <br /> which graphically shows the scope , extent , and <br /> character of the Work to be performed by 28 . Notice of Award--The written notice by <br /> CONTRACTOR . Shop Drawings and other OWNER to the apparent successful bidder stating that <br /> CONTRACTOR submittals are not Drawings as so upon timely compliance by the apparent successful <br /> defined . bidder with the conditions precedent listed therein , <br /> 18 . Effective Date of the Agreement--The OWNER will sign and deliver the Agreement , <br /> date indicated in the Agreement on which it becomes <br /> 29 .effective , but if no such date is indicated , it means the by OWNER to CONce <br /> to �rRACTOR fixing nthetice datelvon <br /> date on which the Agreement is signed and delivered which the Contract Times will commence to run and <br /> by the last of the two parties to sign and deliver. on which CONTRACTOR shall start to perform the <br /> 19 . ENGINEER--The individual or entity Work under the Contract Documents , <br /> named as such in the Agreement. 30 . OWNER--The individual , entity, public <br /> body, or authority with whom CONTRACTOR has <br /> 20 . ENGINEER 's Consultant--An individual or entered into the Agreement and for whom the Work is <br /> entity having a contract with ENGINEER to furnish to be performed , <br /> services as ENGINEER's independent professional <br /> associate or consultant with respect to the Project and 31 . Partial Utilization--Use by OWNER of <br /> a <br /> who is identified as such in the Supplementary substantially completed part of the Work for the pur- <br /> Conditions . pose for which it is intended (or a related purpose) <br /> prior to Substantial Completion of all the Work . <br /> 21 . Field Order--A written order issued by <br /> ENGINEER which requires minor changes in the 32 . PCBs--Polychlorinated biphenyls . <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times , 33 . Petroleum--Petroleum , including crude oil <br /> or any fraction thereof which is liquid at standard <br /> 22 . General Requirements--Sections of conditions of temperature and pressure (60 degrees <br /> Division 1 of the Specifications . The General Fahrenheit and 14 . 7 pounds per square inch <br /> Requirements pertain to all sections of the Specifica- absolute) , such as oil , petroleum , fuel oil , oil sludge <br />, oil <br /> tions . refuse , gasoline , kerosene , and oil mixed with other <br /> 23 . Hazardous Environmental Condition--The non - Hazardous Waste and crude oils , <br /> presence at the Site of Asbestos , PCBs , Petroleum , 34 , _ <br /> of which <br /> Hazardous Waste , or Radioactive Material in such the Work orobet performed Jhe totalcundter cthe Contract <br /> quantities or circumstances that may present a Documents may be the whole, or a part as may be <br /> substantial danger to persons or property exposed indicated elsewhere in the Contract Documents , <br /> thereto in connection with the Work . <br /> 35 . Project <br /> ocumentary <br /> 24 , Hazardous Waste--The term Hazardous information prepared for' bidd ngual� eand conboundst uc ng the <br /> Waste shall have the meaning provided in Section Work . A listing of the contents of the Project <br /> Manual , <br /> 1004 of the Solid Waste Disposal Act (42 USC which may be bound in one or more volumes , is <br /> Section 6903) as amended from time to time . contained in the table(s ) of contents . <br /> 25 . Laws and Regulations; Laws or Regulat- 36 , Radioactive Material--Source , special <br /> ions--Any and all applicable laws , rules , regulations , nuclear, or byproduct material as defined by the <br /> ordinances , codes , and orders of any and all govern - Atomic Energy Act of 1954 (42 USC Section 2011 <br /> et <br /> mental bodies , agencies , authorities , and courts <br /> having jurisdiction . seq . ) as amended from time to time . <br /> 26 . Liens--Charges , securityinterests , or 37 . Resident Project Representative--The <br /> authorized representative of ENGINEER who may be <br /> encumbrances upon Project funds , real property, or assigned to the Site or an <br /> personal property, <br /> g y part thereof. <br /> 38 . Samp/es--Physical examples of <br /> 27 . Milestone--A principal event specified in materials , equipment , or workmanship that are <br /> the Contract Documents relating to an intermediate representative of some portion of the Work and which <br /> 00700 - 6 00700 - General Conditions REV 04-07 . doc �- <br /> F \Public Works\ENGINEERING DIVISION PROJECTS\981013-66th Ave Ph 2 4th St to 16th Stt\Adm m\bid documents\00700 - General Conditions REV 04-07 .doc <br />