My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-056A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-056A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:00:06 PM
Creation date
10/1/2015 4:19:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2012
Control Number
2012-056A
Agenda Item Number
8.K.
Entity Name
Guettler Brothers
Subject
66th Avenue Roadway Improvements Phase 2
Area
4th Street to 16th St.
Project Number
9810-B
Bid Number
2012032
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
11108
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iwo <br /> Contract Documents unless CONTRACTOR knew or ate will be held to review for acceptability to <br />ENGI - <br /> reasonably should have known thereof. NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> B . Preliminary Schedules: Within ten days after shall have an additional ten days to make corrections <br /> the Effective Date of the Agreement ( unless otherwise and adjustments and to complete and resubmit the <br /> specified in the General Requirements ) , CONTRAC- schedules . No progress payment shall be made to <br /> TOR shall submit to ENGINEER for its timely review : CONTRACTOR until acceptable schedules are <br /> 1 . a preliminary progress schedule submitted to ENGINEER , <br /> indicating the times (numbers of days or dates ) 1 . The progress schedule will be <br /> for starting and completing the various stages acceptable to ENGINEER if it provides an <br /> of the Work , including any Milestones specified orderly progression of the Work to completion <br /> in the Contract Documents ; within any specified Milestones and the <br /> Contract Times . Such acceptance will not <br /> 2 , a preliminary schedule of Shop impose on ENGINEER responsibility for the <br /> Drawing and Sample submittals which will list <br /> - progress schedule , for sequencing , scheduling , <br /> each required submittal and the times for sub <br /> or progress of the Work nor interfere with or <br /> mitting , reviewing , and processing such relieve CONTRACTOR from CONTRACTOR 's <br /> submittal ; and full responsibility therefor. <br /> 3 , a preliminary schedule of values for 2 . CONTRACTOR's schedule of Shop <br /> all of the Work which includes quantities and Drawing and Sample submittals will be <br /> prices of items which when added together acceptable to ENGINEER if it provides a <br /> equal the Contract Price and subdivides the workable arrangement for reviewing and <br /> Work into component parts in sufficient detail to processing the required submittals , <br /> serve as the basis for progress payments <br /> during performance of the Work . Such prices 3 . CONTRACTOR's schedule of values <br /> will include an appropriate amount of overhead will be acceptable to ENGINEER as to form <br /> and profit applicable to each item of Work . and substance if it provides a reasonable <br /> allocation of the Contract Price to component <br /> the Site is started , CONTRACTOR and OWNE all Parts of the Work . <br /> each deliver to the other, with copi o each ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> additional insured identified in t upplementary AMENDING , REUSE <br /> Conditions , certificates of urance (and other <br /> evidence of insurance ich either of them or any <br /> additional insur may reasonably request) which 3 . 01 Intent <br /> CONTRA and OWNER respectively are <br /> o RG <br /> A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> 2 . 06 Preconstruction Conference called for by all . <br /> A� %NithiA 20 days after th& cantippIpt To B . It is the intent of the Contract Documents to <br /> to run , but before any Work at the Site i arted , a of) to be functionally <br /> be constructed �in accordaetencelwith the Contract <br /> conference attended by CONTRACT ENGINEER , Documents . Any labor, documentation , services , <br /> and others as appropriate wil held to establish a materials , or equipment that may reasonably be <br /> Work and to disc a schedules referred to in para,,,As as te the inferred from the Contract Documents <br /> or from <br /> p prevailing custom or trade usage as being required to <br /> graph 2 . 05 . rocedures for handling Shop Drawings produce the intended result will be provided whether <br /> and er submittals , processing Applications for or not specifically called for at no additional cost to <br /> OWNER . <br /> 2 . 07 Initial Acceptance of Schedules C . Clarifications and interpretations of the <br /> Contract Documen <br /> A. Unless otherwise provided in the Contract as provided in Article 91 <br /> hall be issued by ENGINEER <br /> Documents , at least ten days before submission of the <br /> first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER , and others as appropri- <br /> 0 - 9 00700 - General Conditions REV 04-07 . doc <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\98108-66th Ave Ph 2 4th St to 16th) SftAdm m\bid documents\00700 - General Conditions REV 04-07 .doc <br /> Y <br /> a' <br />
The URL can be used to link to this page
Your browser does not support the video tag.