My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-066
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 1:35:12 PM
Creation date
10/1/2015 1:48:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
03/08/2011
Control Number
2011-066
Agenda Item Number
15.B.3
Entity Name
Guettler Brothers Construction
Subject
Landfill Class 1 Segement 3 Lateral Expansion
Area
Indian River County Landfill
Supplemental fields
SmeadsoftID
9445
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 . Installation of the pre- cast reinforced concrete box - culvert along the existing <br /> perimeter ditch beneath the vertical expansion access road and as _ indicated on the <br /> Construction Drawings . This item includes connection of the existing storm water <br /> downdrain to the south side of the concrete box culvert as shown in the <br /> Construction Drawings . <br /> 9 . Installation of two 36 - in . nominal diameter corrugated metal pipes ( CMPs ) from the <br /> perimeter drainage ditch to the existing storm water pond in accordance with the <br /> Technical Specifications and as shown on the Construction Drawings . <br /> 10 . Relocation of Manhole 10 towards the west of the proposed vertical expansion <br /> access road . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Geosyntec Consultants , Inc . , hereinafter called ENGINEER , and <br /> who is to act as OWNER' S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a ) Within 30 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized <br /> in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior to <br /> construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From 30 calendar days to 150 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Substantially complete the Work described in these Contract <br /> Documents . <br /> 2 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c ) From 150 calendar days to 182 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 00530-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.