Laserfiche WebLink
� - IS - 13 <br /> `C3 <br /> SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> Bid No . 2013040 <br /> Roof Replacement Project at the Hobart RO Plant, South County RO Plant , and South Regional <br /> Wastewater Treatment Facilities <br /> reement" or "Contract") dated J VC,44 to201' <br /> THIS AGREEMENT ("A g <br /> by and between Indian River County , a political subdivision of the State of Florida (" OWNER") and . <br /> sk(tko 104ji ries (" CONTRACTOR") . <br /> BACKGROUND RECITALS <br /> A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br /> Agreement and the term is as set forth in the Contract Documents . <br /> B . CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents . <br /> NOW THEREFORE , OWNER and CONTRACTOR, in consideration of the mutual covenants <br /> hereinafter set forth , and intending to be legally bound , agree as follows: <br /> ARTICLE 1 WORK <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor, material , and equipment to perform the work as specified <br /> or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or indicated <br /> in the Contract Documents . The work is generally described as follows , and shall include , but is not <br /> necessarily limited to the following : <br /> Roof replacement of approximately 3,029 SF at the Hobart Water Treatment Plant, <br /> 139612 SF at the South County RO Plant, and 1 , 287 SF at the South County <br /> Wastewater Treatment Plant. Construction consists of removal of fascia and soffits as <br /> necessary , patching and leveling as necessary , concrete repair, installation of new <br /> flashing , drips , roofing materials , and gutters as specified in the contract documents . <br /> ARTICLE 2 ENGINEER <br /> 2 . 1 . The project has been designed by Rodolfo Villamizar, P . E . hereinafter called <br /> ENGINEER , and who is to act as OWNER'S representative , assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with completion of the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 . Contract Times . Bidder agrees that the work will be completed in accordance with the <br /> following timeframe . <br /> (a) Within 7 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 00530- 1 <br />