My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-111A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-111A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 9:12:12 AM
Creation date
10/1/2015 5:25:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/18/2013
Control Number
2013-111A
Agenda Item Number
8.O.
Entity Name
Gulf States Industries
Subject
Roof Replacement
Hobart RO Plant, South County RO Plant
South Regional Wastewater Treatment Facilities
Bid Number
2013040
Supplemental fields
SmeadsoftID
12035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� - IS - 13 <br /> `C3 <br /> SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> Bid No . 2013040 <br /> Roof Replacement Project at the Hobart RO Plant, South County RO Plant , and South Regional <br /> Wastewater Treatment Facilities <br /> reement" or "Contract") dated J VC,44 to201' <br /> THIS AGREEMENT ("A g <br /> by and between Indian River County , a political subdivision of the State of Florida (" OWNER") and . <br /> sk(tko 104ji ries (" CONTRACTOR") . <br /> BACKGROUND RECITALS <br /> A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br /> Agreement and the term is as set forth in the Contract Documents . <br /> B . CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents . <br /> NOW THEREFORE , OWNER and CONTRACTOR, in consideration of the mutual covenants <br /> hereinafter set forth , and intending to be legally bound , agree as follows: <br /> ARTICLE 1 WORK <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor, material , and equipment to perform the work as specified <br /> or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or indicated <br /> in the Contract Documents . The work is generally described as follows , and shall include , but is not <br /> necessarily limited to the following : <br /> Roof replacement of approximately 3,029 SF at the Hobart Water Treatment Plant, <br /> 139612 SF at the South County RO Plant, and 1 , 287 SF at the South County <br /> Wastewater Treatment Plant. Construction consists of removal of fascia and soffits as <br /> necessary , patching and leveling as necessary , concrete repair, installation of new <br /> flashing , drips , roofing materials , and gutters as specified in the contract documents . <br /> ARTICLE 2 ENGINEER <br /> 2 . 1 . The project has been designed by Rodolfo Villamizar, P . E . hereinafter called <br /> ENGINEER , and who is to act as OWNER'S representative , assume all duties and responsibilities <br /> and have the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with completion of the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 . Contract Times . Bidder agrees that the work will be completed in accordance with the <br /> following timeframe . <br /> (a) Within 7 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 00530- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.