Laserfiche WebLink
7 . 1 . 1 . CONTRACTOR has familiarized itself with the nature and extent of the Contract <br /> Documents , work, site , locality , and all local conditions and laws and regulations that in any manner <br /> may affect cost, progress , performance or furnishing of the work. <br /> 7 . 1 . 2 . CONTRACTOR has studied carefully all reports of explorations and drawings of <br /> physical conditions which are identified in the Supplementary Conditions as provided in Paragraph <br /> 4 . 02 of the General Conditions , and accepts the determination set forth in Paragraph SC4 . 02 of the <br /> Supplementary Conditions of the extent of the technical data contained in such reports and drawings <br /> upon which CONTRACTOR is entitled to rely . <br /> 7 . 1 . 3 . CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br /> obtaining and carefully studying) all such examinations, investigations, explorations , tests , reports and <br /> studies (in addition to or to supplement those referred to in Paragraph 7 . 2 above) which pertain to the <br /> physical conditions at or contiguous to the site or otherwise may affect the cost, progress, <br /> performance or furnishing of the work as CONTRACTOR considers necessary for the performance of <br /> furnishing of the work at the Contract Price , within the Contract Time and in accordance with the other <br /> terms and conditions of the Contract Documents , including specifically the provisions of Paragraph <br /> 4 . 02 of the General Conditions ; and no additional examinations, investigations, explorations , tests , <br /> reports , studies or similar information or data are or will be required by CONTRACTOR for such <br /> purposes . <br /> 7 . 1 .4 . CONTRACTOR has correlated the results of all such observations , examinations , <br /> investigations , explorations , tests , reports and studies with the terms and conditions of the Contract <br /> Documents . <br /> 7 . 1 . 5 . CONTRACTOR has given ENGINEER written notice of all conflicts, errors or <br /> discrepancies that he has discovered in the Contract Documents and the written resolution thereof by <br /> ENGINEER is acceptable to CONTRACTOR . <br /> ARTICLE 8 CONTRACT DOCUMENTS <br /> 8 . 1 . The Contract Documents which comprise the entire agreement between OWNER and <br /> CONTRACTOR concerning the work consist of the following : <br /> 8 . 1 . 1 . This Agreement (Section 00530) . <br /> 8 . 1 . 2 . Public Construction Bond (Section 00600) . <br /> 8 . 1 . 3 . Notice of Award and Notice to Proceed (examples in Section 00800) . <br /> 8 . 1 .4 . General Conditions (Section 00700) . <br /> 8 . 1 . 5 . Supplementary Conditions (Section 00800) . <br /> 8 . 1 . 6 . Specifications and drawings bearing the title " Roof Replacement Project at the <br /> Hobart RO Plant South County RO Plant and South Renional Wastewater <br /> Treatment Facilities " as listed in the table of contents hereof. <br /> 8 . 1 .7 . Exhibits and details inclusive with each sheet bearing the following general title " Roof <br /> Replacement Prosect at the Hobart RO Plant South County RO Plant, and <br /> South Regional Wastewater Treatment Facilities" , inclusive . <br /> 8 . 1 . 8 . Addenda numbers P to <br /> 8 . 1 . 9 . CONTRACTOR' S Bid (Section 00300) . <br /> 8 . 1 . 10 . Specifications bearing the title " IRCDUS Water and Wastewater Utility Standards , <br /> July 2011 " I or the latest version thereof. <br /> 8 . 1 . 11 . The following , which may be delivered or issued after the effective date of the <br /> Agreement and are not attached hereto : All written amendments and other <br /> 00530-4 <br />