Laserfiche WebLink
Task 11 ATSTM Pilot System Demobilization <br /> At the end of the six (6) month operating period , remove the CONSULTANT supplied MPU <br /> equipment and structures from the site and restore the site to the condition existing prior to <br /> installation . <br /> Task 12 ATSTM Pilot Final Report <br /> Prepare and submit to the COUNTY for review , a final project report that shall include a <br /> complete compilation and analysis of performance data for the six month field <br /> demonstration (pilot) project . From this analysis , adjustments , if required , will be made to <br /> the system design , system performance , and harvesting /composting projections for a full - <br /> scale Algal Turf Scrubber® system to be applied to the PC -South Water Treatment and <br /> Re- Use Water Project . Calibrate and verify the Algal Turf Scrubber Design Model <br /> (ATSDEM ) with collected data , and conduct design model runs for a proposed full scale <br /> facility , and present these along with the report during a review meeting with the COUNTY . <br /> Task includes one ( 1 ) meeting with the Indian River County . <br /> Provided by Others <br /> 1 . Review comments to Draft Report <br /> ** END OF ATTACHMENT 1 ** <br /> Page 10 of 13 <br /> FAPublic Works\KeithM\Stormwater Projects\South Relief Canal Screening System and AT%Work OrderMydromentia Work Order PCS- 1 - Pilot <br /> Plant - 8 -23 -2010 . doc <br />