Laserfiche WebLink
I . Field reconnaissance ; recover existing section lines , '/4 section lines , lot and block corners <br /> to establish right- of-ways , set up and monument survey baseline , tie survey to Indian River <br /> County Horizontal Control Network . Control Points along baseline to be coordinated with <br /> County Surveyor. <br /> Surveyor <br /> 40 hours @ $ 110 . 00 / hr . . . . . . . . . . . . . . . . . . . . $ 4 , 400 . 00 <br /> Survey Crew ( 2 men ) <br /> 120 hours @ $ 125 . 00 / hr . . . . . . . . . . . . . . . . . . . $ 15 , 000 . 00 <br /> II . Closed level run including bench marks set on control points as well as off-site : <br /> Survey Crew ( 2 men ) <br /> 32 hours @ $ 125 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 4 , 000 . 00 <br /> III . Digital terrain mapping including but not limited to <br /> A) Vegetation , large trees , above ground utilities , street signs and all drainage structures <br /> and drainage pipes . <br /> B) Route to include Topo 100 ' down all side streets , drives and all existing right of ways <br /> North and South of 8th Street corridor. <br /> C ) Cross sections every 100 ' along main route extending 25' beyond existing North right of <br /> way line . <br /> D) Locate and identify driveways , sidewalks , headwalls , pipe ends , inverts (size , material <br /> and length ) North of 8th Street including any drainage pipes crossing to Lateral " B-3 " <br /> Canal south of 8th Street. <br /> E ) Southerly limits along 8th Street will be at the north top of bank of the canal , expanding <br /> around any existing drives to include driveway extending 25 feet beyond canal right of <br /> way, topo shots around top of bank to an intersection with the southern top of bank , <br /> headwalls and culverts noting size and material but excluding inverts . <br /> Survey Crew (2 men ) <br /> 144 hours @ $ 125 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 189000 . 00 <br /> IV. Cad drafting consisting of two stages ; first a working draft showing block lines , right-of-way <br /> lines and survey baseline , and second being a finished survey : <br /> Surveyor <br /> 38 hours @ $ 110 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 4 , 180 . 00 <br /> Autocad Technician <br /> 130 hours @ $ 65 . 00 /hr . . . . . . . . . . . . . . . . . . . . . $ 8 , 450 . 00 <br /> Project Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 54, 030 . 00 ( Lump Sum ) <br /> F :\Engineering\Tom Croonquist\Private\BCC Agenda Items\2011 \ 11 -05 -05 8th Street 1049 - 58th Ave to 20th Ave - Route Survey - IRS\Consent <br /> Agenda Support Docs\ 11 -05-09 IRS Proposal . doc <br />