My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-115
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 1:27:42 PM
Creation date
10/1/2015 2:38:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2011
Control Number
2011-115
Agenda Item Number
8.E.
Entity Name
Indian River Survey Inc.
Subject
Route Survey
Area
8th St. (Glendale Road) from 58th Ave. to 20th Ave.
Project Number
1049
Supplemental fields
SmeadsoftID
9914
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . Field reconnaissance ; recover existing section lines , '/4 section lines , lot and block corners <br /> to establish right- of-ways , set up and monument survey baseline , tie survey to Indian River <br /> County Horizontal Control Network . Control Points along baseline to be coordinated with <br /> County Surveyor. <br /> Surveyor <br /> 40 hours @ $ 110 . 00 / hr . . . . . . . . . . . . . . . . . . . . $ 4 , 400 . 00 <br /> Survey Crew ( 2 men ) <br /> 120 hours @ $ 125 . 00 / hr . . . . . . . . . . . . . . . . . . . $ 15 , 000 . 00 <br /> II . Closed level run including bench marks set on control points as well as off-site : <br /> Survey Crew ( 2 men ) <br /> 32 hours @ $ 125 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 4 , 000 . 00 <br /> III . Digital terrain mapping including but not limited to <br /> A) Vegetation , large trees , above ground utilities , street signs and all drainage structures <br /> and drainage pipes . <br /> B) Route to include Topo 100 ' down all side streets , drives and all existing right of ways <br /> North and South of 8th Street corridor. <br /> C ) Cross sections every 100 ' along main route extending 25' beyond existing North right of <br /> way line . <br /> D) Locate and identify driveways , sidewalks , headwalls , pipe ends , inverts (size , material <br /> and length ) North of 8th Street including any drainage pipes crossing to Lateral " B-3 " <br /> Canal south of 8th Street. <br /> E ) Southerly limits along 8th Street will be at the north top of bank of the canal , expanding <br /> around any existing drives to include driveway extending 25 feet beyond canal right of <br /> way, topo shots around top of bank to an intersection with the southern top of bank , <br /> headwalls and culverts noting size and material but excluding inverts . <br /> Survey Crew (2 men ) <br /> 144 hours @ $ 125 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 189000 . 00 <br /> IV. Cad drafting consisting of two stages ; first a working draft showing block lines , right-of-way <br /> lines and survey baseline , and second being a finished survey : <br /> Surveyor <br /> 38 hours @ $ 110 . 00 /hr . . . . . . . . . . . . . . . . . . . . $ 4 , 180 . 00 <br /> Autocad Technician <br /> 130 hours @ $ 65 . 00 /hr . . . . . . . . . . . . . . . . . . . . . $ 8 , 450 . 00 <br /> Project Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 54, 030 . 00 ( Lump Sum ) <br /> F :\Engineering\Tom Croonquist\Private\BCC Agenda Items\2011 \ 11 -05 -05 8th Street 1049 - 58th Ave to 20th Ave - Route Survey - IRS\Consent <br /> Agenda Support Docs\ 11 -05-09 IRS Proposal . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.