Laserfiche WebLink
Residue shall be deducted from the District ' s payments to the Company, in the manner <br /> generally described in Section 4 . 1 . 13 , below. <br /> 6 . The Company ' s disposal cost for Ash Residue shall be calculated <br /> by multiplying the applicable disposal fee times the actual weight of the Ash Residue . <br /> The weight of the Ash Residue shall be measured at the District ' s scale house, or the <br /> Company ' s scale house, whenever a load of Ash Residue is delivered to the Landfill . <br /> G . Company ' s Responsibilities Regarding Landfill Gas <br /> 1 . Subject to the other conditions contained herein , Company shall <br /> take and use all of the Landfill Gas that is produced by District ' s Landfill , up to the <br /> design capacity of the Company ' s LFG Assets (i . e . , one thousand ( 1 , 000) standard cubic <br /> feet of LFG per minute) . <br /> 2 . Company shall be responsible , at its own cost, for the design , <br /> permitting, construction, connection, operation, maintenance , repair, and replacement of <br /> any capital improvements and equipment that need to be added to the District ' s existing <br /> Landfill Gas collection and flare system to (i) enable Company to divert Landfill Gas <br /> from the District ' s flare and transport such gas via pipeline to the Facility and ( ii) ensure <br /> the reliable delivery of the gas for Company ' s use . The exact location of any such <br /> improvements on the District ' s property and the general components of any necessary <br /> interconnection equipment and facilities shall be mutually agreed upon by Company and <br /> District prior to the commencement of construction . District shall provide Company with <br /> the necessary access , including easements as necessary, to the Landfill Gas system <br /> equipment located on the District ' s property for the purpose of allowing Company to <br /> perform its obligations under this Agreement . <br /> 3 . Notwithstanding the foregoing, the District shall control and be <br /> responsible for the operation and maintenance of the District ' s LFG Assets located <br /> between the Landfill and the Delivery Point (i . e . , the location where the District ' s LFG <br /> Assets will interconnect with the Company ' s LFG Assets) , <br /> 4 . On or before the LFG Commencement Date , Company shall install <br /> all of the necessary pipelines , improvements , and equipment needed to transport and use <br /> the Landfill Gas in the Facility . On or before the LFG Commencement Date , Company <br /> shall provide written certification to District that all such pipelines , improvements , and <br /> equipment are fully operational . <br /> 5 . Company shall install , calibrate , and maintain appropriate meters <br /> to measure the quantity and quality of the Landfill Gas . <br /> 19 <br />