My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-260
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-260
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 9:43:03 AM
Creation date
10/1/2015 3:26:46 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
12/13/2011
Control Number
2011-260
Agenda Item Number
15.B.3
Entity Name
INEOS New Planet BioEnergy
Indian River County Solid Waste Disposal District
Subject
Landfill Gas Interconnect Agreement
Area
925 SW 74th Avenue
Alternate Name
SWDD
Supplemental fields
SmeadsoftID
10562
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
boiler is not operating or the sulfur content of the LFG exceeds twenty- one (2 1 ) pounds per hour . <br /> The Parties recognize that Company ' s use of LFG at its Facility may be curtailed or interrupted <br /> when the boiler is not operating due to the maintenance requirements of the Facility and/or Force <br /> Majeure events . <br /> 5 . 2 The District shall use Commercially Reasonable Efforts to deliver all of its <br /> Acceptable LFG to the Delivery Point on a regular and routine basis . Company is guaranteed all <br /> of District ' s Acceptable LFG , except as otherwise provided in Section 5 . 7 , below, or other <br /> provisions of this Agreement . <br /> 5 . 3 The quantity of LFG delivered by District shall be determined by conducting <br /> appropriate measurements with the Metering equipment . The Metering equipment shall be <br /> maintained by the Company and shall be calibrated on a quarterly basis or in accordance with the <br /> manufacturer ' s specifications , whichever is more frequent . At its expense , District may arrange <br /> for an independent third party to calibrate or otherwise verify the accuracy of the meters and <br /> instruments used by the Company to measure the LFG . Any independent tests shall be <br /> coordinated with the Company in advance . The results of any calibration tests or inspections by <br /> either Party shall be provided to the other Party , upon request . The specific test methods shall be <br /> established by mutual agreement of the Parties . <br /> 5A At its option and expense , the Company may determine the Delivery Capacity by <br /> conducting appropriate tests . The Delivery Capacity shall be based on the average flow of <br /> Acceptable LFG to the Delivery Point during a seventy- two ( 72) hour period . The Delivery <br /> Capacity shall reflect the amount of Acceptable LFG that the District can produce from the <br /> Landfill and deliver to the Delivery Point while maintaining compliance with all applicable laws <br /> and prudently operating the Landfill and the District ' s LFG Assets . The Parties recognize and <br /> acknowledge that the Delivery Capacity may fluctuate during the term of this Agreement . <br /> 5 . 5 The District shall not be obligated to deliver Acceptable LFG to Company at any <br /> specific rate . The District shall attempt to deliver Acceptable LFG at a relatively uniform hourly <br /> rate of flow, but the District does not warrant or guarantee that it will be able to supply Company <br /> with any minimum amount of Acceptable LFG on an hourly , daily or other basis . <br /> 5 . 6 The District shall notify Company promptly if the District anticipates that the <br /> production of LFG will significantly increase or decrease in the future . Company shall notify the <br /> District promptly if Company anticipates that its use of LFG will significantly increase or <br /> decrease in the future . <br /> 5 . 7 During the term of this Agreement , the District shall not undertake any action that <br /> would : (a) temporarily divert Acceptable LFG from Company to some other use or user without <br /> first obtaining Company ' s written approval , which shall not be unreasonably withheld or <br /> delayed ; or (b) permanently reduce the production of LFG at the Landfill , unless such action is <br /> ( 1 ) required by an applicable law or (2 ) otherwise deemed necessary and appropriate by the <br /> District for the protection of the public health, safety , or welfare . <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.